Laserfiche WebLink
Fuel Containment <br />17'X10'X3'X8" <br />Demo. and on -site <br />1,004.00 <br />SF <br />$1.33 <br />$1,339.34 <br />Sumps (2) <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />-Petroleum <br />10 cy <br />Dispose of <br />10.00 <br />CY <br />$145.00 <br />$1,450.00 <br />Contaminated Soil <br />contaminated soil at <br />Removal <br />approved landfill - <br />Minimum <br />Antifreeze Tank <br />39'X11'X4'X8" <br />Demo. and on -site <br />829.00 <br />SF <br />$1.33 <br />$1,105.89 <br />Sump <br />disposal in existing pit, <br />8 in. thick - Max. <br />10,000 ft. haul <br />Stacking Tube - Raw <br />9'DX59' <br />Bldg. (SN) demo./on- <br />3,753.00 <br />CF <br />$0.22 <br />$806.90 <br />Coal <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Water Pumphouse <br />20'DX15'X8" <br />Bldg. (SN) demo./on- <br />950.00 <br />CF <br />$0.22 <br />$204.25 <br />Tank <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Scale House <br />6'X4'X8' <br />Bldg. (SN) demo./on- <br />192.00 <br />CF <br />$0.22 <br />$41.28 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Scale <br />12'X30'X4' <br />Demo. and on -site <br />360.00 <br />SF <br />$2.00 <br />$720.72 <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />Powerline Removal <br />19580 LF <br />Disposal of utility pole <br />19,580.00 <br />LF <br />$0.01 <br />$195.80 <br />cross arms and <br />hardware surplus <br />material <br />Sewage Treatment <br />8.5'X5.5'X96' <br />Comprehensive <br />1.00 <br />EA <br />$7,335.93 <br />$7,335.93 <br />Tank - Buried <br />storage tank removal, <br />non -leaking - 9,000 to <br />12,000 gal. tank <br />Slope Belt Conveyor <br />75 LF X 8' <br />Conveyor, Horizontal <br />1.22 <br />EA <br />$3,125.00 <br />$3,812.50 <br />Belt 24" Belt, 61.5' <br />Length <br />Transfer Belt <br />8'X85 LF <br />Conveyor, Horizontal <br />1.38 <br />EA <br />$3,125.00 <br />$4,312.50 <br />Conveyor <br />Belt 24" Belt, 61.5' <br />Length <br />Tube Belt Conveyor <br />8'X582 LF <br />Conveyor, Horizontal <br />9.50 <br />EA <br />$3,125.00 <br />$29,687.50 <br />Belt 24" Belt, 61.5' <br />Length <br />Raw Coal to <br />6'X374 LF <br />Conveyor, Horizontal <br />6.00 <br />EA <br />$3,125.00 <br />$18,750.00 <br />Transfer Bldg <br />Belt 24" Belt, 61.5' <br />Length <br />Raw Coal Reclaim to <br />6'X296 LF <br />Conveyor, Horizontal <br />4.80 <br />EA <br />$3,125.00 <br />$15,000.00 <br />Prep Plant <br />Belt 24" Belt, 61.5' <br />Length <br />Clean Coal Reclaim <br />6'X497 LF <br />Conveyor, Horizontal <br />8.00 <br />EA <br />$3,125.00 <br />$25,000.00 <br />to Transfer Bldg. <br />Belt 24" Belt, 61.5' <br />Length <br />Clean Coal from <br />6'X230 LF <br />Conveyor, Horizontal <br />3.74 <br />EA <br />$3,125.00 <br />$11,687.50 <br />Prep Plant <br />Belt 24" Belt, 61.5' <br />Length <br />Refuse Belt- <br />6'X1,050 LF <br />Conveyor, Horizontal <br />17.00 <br />EA <br />$3,125.00 <br />$53,125.00 <br />