to 24 in. thick -
<br />Reinforced
<br />-Hoist Unit and
<br />18,OOOlbs
<br />USER PROVIDED ITEM
<br />18,000.00
<br />LBS
<br />$0.25
<br />$4,500.00
<br />Controls
<br />Hoist House 2
<br />20'X40'X20'
<br />Bldg. (SN) demo./on-
<br />16,000.00
<br />CF
<br />$0.22
<br />$3,440.00
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Sheave
<br />30 Tons
<br />USER PROVIDED ITEM
<br />30.00
<br />TON
<br />$24.34
<br />$730.20
<br />-Pad
<br />50'X30'X5.4"
<br />Pavement, concrete,
<br />300.00
<br />CY
<br />$133.50
<br />$40,050.00
<br />demolition only, 7 in.
<br />to 24 in. thick -
<br />Reinforced
<br />Industrial Building -
<br />246'X50'X23'
<br />Bldg. (SN) demo./on-
<br />282,900.00
<br />CF
<br />$0.22
<br />$60,823.50
<br />Segment 1
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />Industrial Building -
<br />246'X49'X38'
<br />Bldg. (SN) demo./on-
<br />458,052.00
<br />CF
<br />$0.22
<br />$98,481.18
<br />Segment 2
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />Industrial Building -
<br />246'X40.5'X21'
<br />Bldg. (SN) demo./on-
<br />209,223.00
<br />CF
<br />$0.22
<br />$44,982.95
<br />Segment 3
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Pad
<br />246'X139.5'X6"
<br />Demo. and on -site
<br />34,317.00
<br />SF
<br />$1.00
<br />$34,351.32
<br />disposal in existing pit,
<br />6 in. thick - Max.
<br />10,000 ft. haul
<br />Transfer Building
<br />42'X22'X31.5'
<br />Bldg. (SN) demo./on-
<br />29,106.00
<br />CF
<br />$0.22
<br />$6,257.79
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />Breaker Building
<br />65'X45'X65'
<br />Bldg. (SN) demo./on-
<br />190,125.00
<br />CF
<br />$0.22
<br />$40,876.88
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Pad
<br />65'X45'X24"
<br />Pavement, concrete,
<br />217.00
<br />CY
<br />$133.50
<br />$28,969.50
<br />demolition only, 7 in.
<br />to 24 in. thick -
<br />Reinforced
<br />Slope Conveyor
<br />50' x 37.5' x
<br />Bldg. (MN) demo./on-
<br />28,125.00
<br />CF
<br />$0.22
<br />$6,159.38
<br />Drive House
<br />15'h
<br />site disposal in existing
<br />Building
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Drive and Internal
<br />3,706 CF
<br />Bldg. (SN) demo./on-
<br />3,706.00
<br />CF
<br />$0.22
<br />$796.79
<br />Equipment
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Foundation
<br />45'X37'X5'
<br />Pavement, concrete,
<br />308.00
<br />CY
<br />$133.50
<br />$41,118.00
<br />demolition only, 7 in.
<br />to 24 in. thick -
<br />Reinforced
<br />-Slope Belt
<br />1,0001 X 6'w
<br />Conveyor, demolition,
<br />36,000.00
<br />CF
<br />$0.30
<br />$10,800.00
<br />x6'h
<br />on -site disposal,
<br />existing pit, 10,000 ft.
<br />haul
<br />-Transfer Belt
<br />1,0001 x
<br />Conveyor, demolition,
<br />36,000.00
<br />CF
<br />$0.30
<br />$10,800.00
<br />
|