Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(off) <br />(off) <br />(fpm) <br />Time <br />(min) <br />1 <br />1500.00 <br />4.00 <br />3.00 <br />7.00 <br />1568 <br />0.989 <br />Haul Time: 1 0.989 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(off) <br />(off) <br />(fpm) <br />Time <br />(min) <br />1 <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />0.567 <br />Return Time: 0.567 minutes <br />Total Truck Cvcle Time: 3.486 minutes <br />Loading Tool unit <br />Production <br />551.07 <br />LCY/Hour <br />Adjusted for job efficiency: <br />457.39 <br />LCY/Hour <br />Truck Unit Production <br />162.82 <br />LCY/Hour <br />Adjusted for job efficiency: <br />135.14 <br />LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) <br />Selected Number of Trucks: <br />3 <br />Truck(s) <br />Adjusted hourly truck team production: <br />405.43 <br />LCY/Hour <br />Adjusted single truck/loader team production: <br />405.43 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: <br />405.43 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) <br />Total job time: <br />48.56 Hours <br />Unit cost: <br />$2.848 <br />/LCY <br />Total job cost: <br />$56,080 <br />