Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Replace topsoil over borrow area RDA <br />Site: New Elk Mine Permit Action: Mid Term 08 Permit/Job#: I C1981012 <br />PROJECT IDENTIFICATION <br />Task #: <br />023 <br />State: <br />Colorado <br />Abbreviation: <br />None <br />Date: <br />8/5/2021 <br />County: <br />Las Animas <br />Filename: <br />C012-023 <br />User: <br />DC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: <br />-Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Shift basis: 1 per day <br />Equipment Description <br />Cat 725 <br />Cat 319D L 8'-10" Stick <br />Cat D7R DS Series II LGP <br />Cat D7R DS Series II LGP <br />NA <br />NA <br />Support Equipment <br />Maintenance Equipment <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />50 <br />50 <br />NA <br />NA <br />Ownership cost/hour: <br />$72.63 <br />$52.19 <br />$81.02 <br />$81.02 <br />NA <br />NA <br />Operating cost/hour: <br />$49.40 <br />$43.34 <br />$39.67 <br />$39.67 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$32.54 <br />$37.32 <br />$41.30 <br />$41.30 <br />NA <br />NA <br />Unit Subtotals: <br />$154.57 <br />$132.85 <br />$161.99 <br />$161.99 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />1 <br />1 <br />j 0 <br />0 <br />Group Subtotals: <br />Work: $287.42 <br />Support: $323.98 <br />Maint: $0.00 <br />Total work team cost/hour: $611.40 <br />MATERIAL QUANTITIES <br />Initial volume: 6,050 <br />Loose volume: 6,050 <br />Source of estimated volume <br />Source of estimated swell factor <br />Material Purchase Cost <br />Total Cost <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />CCY Swell factor: 1.000 <br />LCY <br />Division of Reclamation, Mining & Sa <br />Cat Handbook <br />$0.00 <br />$0.00 <br />