Laserfiche WebLink
New Elk Mine (C-1981-012) —MT8 <br />Minor Revisions since the last Mid Term Review (Mid Term Review 7) Approved August 2016: <br />Revision <br />Number <br />Description <br />Proposed Decision <br />Date <br />MR 127 <br />Update Contact information <br />28 May 2021 <br />MR 126 <br />Move Location of Drill Hole <br />05 February 2021 <br />MR 125 <br />Weed Management Plan <br />20 August 2018 <br />MR 124 <br />Update Exhibit 1 and Exhibit 28 <br />02 May 2017 <br />Permit Transfers since the last Mid Term Review (MT 7) that was approved August 2016: <br />Revision <br />Number <br />Description <br />Proposed Decision Date <br />SO4 <br />Change of Ownership <br />22 January 2021 <br />There have been no bond releases since Renewal No. 5 approved 6 March 2009. <br />The stipulation history for the New Elk Mine was reviewed as part of the midterm review. The review included <br />an investigation of any stipulations imposed since the last permit renewal, and any responses to existing <br />stipulations received since the last permit renewal. Any stipulations associated with this permit and issued over <br />the life of this operation which are not discussed in this midterm review have been complied with or terminated. <br />Stipulations consist of timely submissions of the reports and inspections identified in table 4, below. All reports <br />and inspections have been submitted. <br />Annual Hydrology Reports Pond Inspections Discharge Monitoring Reports <br />Annual Reclamation Reports Refuse Pile Inspections <br />