My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-29_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2021-08-29_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 9:10:51 AM
Creation date
8/30/2021 8:57:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
8/29/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Coal Company, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Strip and Place 5 acres of topsoil RDA (TR75) <br />Site: New Elk Mine Permit Action: I Mid Term 08 Permit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: <br />019 <br />State: <br />Colorado <br />Abbreviation: <br />None <br />Date: <br />8/5/2021 <br />County: <br />Las Animas <br />Filename: <br />C012-019 <br />User: <br />DC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: <br />-Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Shift basis: 1 per day <br />Equipment Description <br />Cat 725 <br />Cat 319D L 8'-10" Stick <br />Cat D7R DS Series II LGP <br />Cat D7R DS Series II LGP <br />CAT 14M <br />Water Tanker, 3,500 Gal. <br />Support Eauipment <br />Maintenance Eauipment <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />50 <br />50 <br />25 <br />25 <br />Ownership cost/hour: <br />$72.63 <br />$52.19 <br />$81.02 <br />$81.02 <br />$85.80 <br />$17.15 <br />Operating cost/hour: <br />$49.40 <br />$43.34 <br />$39.67 <br />$39.67 <br />$15.10 <br />$7.30 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$32.54 <br />$37.32 <br />$41.30 <br />$41.30 <br />$28.56 <br />$0.00 <br />Unit Subtotals: <br />$154.57 <br />$132.85 <br />$161.99 <br />$161.99 <br />$129.46 <br />$24.45 <br />Number of Units: <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $287.42 <br />Support: $323.98 <br />Maint: $153.91 <br />Total work team cost/hour: $765.31 <br />MATERIAL QUANTITIES <br />Initial volume: 9,274 <br />Loose volume: 9,274 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />HOURLY PRODUCTION <br />CCY Swell factor: 1.000 <br />LCY <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />$0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.