My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-29_GENERAL DOCUMENTS - C1981012
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981012
>
2021-08-29_GENERAL DOCUMENTS - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 9:10:51 AM
Creation date
8/30/2021 8:57:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
8/29/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Coal Company, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />Reseed Zig Zag with Rangland Mix <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1.60 <br />$2,122 <br />$13,295 <br />$2,189 <br />$14,840 <br />$1,535 <br />$1,410 <br />$3,241 <br />Reseed West DWDA Expansion Area with <br />Rangeland Mix <br />REVEGE <br />20.40 <br />Seed NW Vent Fan and Access Road (TR72) <br />REVEGE <br />1.55 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />3.70 <br />Mobilize/Demobilize Equipment for Pond Cleaning <br />MOBILIZE <br />3.70 <br />Mobilize/Demobilize Equipment for Pond Removal <br />MOBILIZE <br />3.70 <br />Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE <br />3.70 <br />SUBTOTALS: <br />3948.04 <br />$4,160,423 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total = <br />$84,041 <br />1.05 <br />Total = <br />$43,684 <br />1,719.04 <br />Total = <br />$123,822 <br />10.00 <br />Total = <br />$416,042 <br />TOTAL O & P = <br />$667,590 <br />CONTRACT AMOUNT (direct + O & P) = <br />$4,828,013 <br />LEGAL- ENGINEERING- PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />$0 <br />4.25 <br />3.58 <br />Total = $0 <br />Total = $205,191 <br />$172,843 <br />CONTINGENCY: 0.00 Total = $0 <br />TOTAL INDIRECT COST = $1,045,623 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,206,046 <br />
The URL can be used to link to this page
Your browser does not support the video tag.