Laserfiche WebLink
073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />Reseed Zig Zag with Rangland Mix <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1.60 <br />$2,122 <br />$13,295 <br />$2,189 <br />$14,840 <br />$1,535 <br />$1,410 <br />$3,241 <br />Reseed West DWDA Expansion Area with <br />Rangeland Mix <br />REVEGE <br />20.40 <br />Seed NW Vent Fan and Access Road (TR72) <br />REVEGE <br />1.55 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />3.70 <br />Mobilize/Demobilize Equipment for Pond Cleaning <br />MOBILIZE <br />3.70 <br />Mobilize/Demobilize Equipment for Pond Removal <br />MOBILIZE <br />3.70 <br />Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE <br />3.70 <br />SUBTOTALS: <br />3948.04 <br />$4,160,423 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total = <br />$84,041 <br />1.05 <br />Total = <br />$43,684 <br />1,719.04 <br />Total = <br />$123,822 <br />10.00 <br />Total = <br />$416,042 <br />TOTAL O & P = <br />$667,590 <br />CONTRACT AMOUNT (direct + O & P) = <br />$4,828,013 <br />LEGAL- ENGINEERING- PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />$0 <br />4.25 <br />3.58 <br />Total = $0 <br />Total = $205,191 <br />$172,843 <br />CONTINGENCY: 0.00 Total = $0 <br />TOTAL INDIRECT COST = $1,045,623 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,206,046 <br />