Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: 0.40 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: <br />Site Altitude: 7500 feet <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: I 0.830 0.830 <br />Travel Time: <br />Road Condition: Fi <br />Haul Route: <br />smooth. rolline. dirt/It. surfaced. watered. maintained 3.0 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time (min) <br />1 <br />700.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />0.56 <br />Haul Time: 1 0.56 1 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time (min) <br />1 <br />700.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />0.30 <br />Return Time: 0.30 minutes <br />Total Scraper team cycle time: 1.86 minutes <br />Adjusted for job conditions: 504.69 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,009.39 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,009.39 LCY/Hour <br />Unadjusted unit production/hour: 608.06 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Total job time: 0.30 Hours <br />Unit cost: $1.196 /LCY Total job cost: $359 <br />