Laserfiche WebLink
Car Dept. Office Slab <br />56 X 20 <br />Demo. and on -site <br />1,120.00 <br />SF <br />$1.00 <br />$1,121.12 <br />disposal in existing pit, 6 <br />in. thick - Max. 10,000 <br />ft. haul <br />Car Dept. Office <br />50 X 3.5 <br />Demo. and on -site <br />175.00 <br />SF <br />$1.00 <br />$175.18 <br />Sidewalk <br />disposal in existing pit, 6 <br />in. thick - Max. 10,000 <br />ft. haul <br />Fire Hose Building <br />8 X 8 X 8 <br />Bldg. (SN) demo./on-site <br />512.00 <br />CF <br />$0.22 <br />$110.08 <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />Fire Hose Building <br />8 X 8 <br />Demo. and on -site <br />64.00 <br />SF <br />$1.00 <br />$64.06 <br />Slab <br />disposal in existing pit, 6 <br />in. thick - Max. 10,000 <br />ft. haul <br />Fire Hose Propane <br />16 X 3 <br />Bldg. (SN) demo./on-site <br />144.00 <br />CF <br />$0.22 <br />$30.96 <br />Tank <br />disposal in existing pit <br />or cut - Max. 10,000 ft. <br />haul <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 24.00 (unadjusted): $82,906.26 location): $77,931.88 <br />