Laserfiche WebLink
(CMP) - 24 in. <br />diameter pipe <br />Culvert #C29 <br />24" <br />Pipe, corrugated metal <br />34.00 <br />LF <br />$7.25 <br />$246.64 <br />(CMP) - 24 in. <br />diameter pipe <br />Bathhouse (TR61) <br />62'1 x 21w' x <br />Bldg. (SN) demo./on- <br />15,624.00 <br />CF <br />$0.22 <br />$3,359.16 <br />12'h <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-bathhouse pad <br />62/lx 21'w x <br />Demo. and on -site <br />1,302.00 <br />SF <br />$1.00 <br />$1,303.30 <br />(TR61) <br />0.5'th <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />Belt feeder (MR101) <br />35' x 12' x6' <br />Bldg. (SN) demo./on- <br />2,520.00 <br />CF <br />$0.22 <br />$541.80 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />36" Belt (MR101) <br />36" x 500 If <br />Conveyor, Horizontal <br />8.10 <br />EA <br />$3,125.00 <br />$25,312.50 <br />Belt 24" Belt, 61.5' <br />Length <br />Elevating belt <br />36" x 100 If <br />Conveyor, Horizontal <br />1.62 <br />EA <br />$3,125.00 <br />$5,062.50 <br />(MR101) <br />Belt 24" Belt, 61.5' <br />Length <br />Office shop <br />100'I x 50'w x <br />Bldg. (MN) demo./on- <br />90,000.00 <br />CF <br />$0.22 <br />$19,710.00 <br />(MR105) <br />18'h <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Office shop floor <br />100'I x 50'w x <br />Demo. and on -site <br />5,000.00 <br />SF <br />$1.00 <br />$5,005.00 <br />(MR105) <br />0.5'th <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />Pump house <br />12'x 12'x 10'h <br />Bldg. (SN) demo./on- <br />1,440.00 <br />CF <br />$0.22 <br />$309.60 <br />(MR105) <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-pump house floor <br />12'x12'x 0.5'th <br />Demo. and on -site <br />144.00 <br />SF <br />$1.00 <br />$144.14 <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />Radial stacker pads <br />3'x 3'x 1' <br />Demo. and on -site <br />9.00 <br />SF <br />$2.02 <br />$18.14 <br />(MR97) <br />disposal in existing pit, <br />12 in. thick - Max. 200 <br />ft. push <br />200 foot conveyor <br />200 If <br />Conveyor, Horizontal <br />3.25 <br />EA <br />$3,125.00 <br />$10,156.25 <br />extension (MR97) <br />Belt 24" Belt, 61.5' <br />Length <br />Conveyor tube <br />80'1 x 10' dia <br />Bldg. (SN) demo./on- <br />6,282.00 <br />CF <br />$0.22 <br />$1,350.63 <br />(MR97) <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Disposal of <br />19580 LF <br />Disposal of utility pole <br />19,580.00 <br />LF <br />$0.01 <br />$195.80 <br />Powerline <br />cross arms and <br />crossarms, cable, <br />hardware surplus <br />et.al. <br />material <br />Fan and Duct <br />(50'x12'x12')2 <br />Bldg. (MN) demo./on- <br />14,400.00 <br />CF <br />$0.22 <br />$3,153.60 <br />(MR113) <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />