Laserfiche WebLink
Table D-1 - Mining Timetable <br /> Years of <br /> Description Mining <br /> Build topsoil berm and overburden stockpile. Revegtate berm and <br /> pile immediately upon completion. Mine out Phase 1A and 1 B. 1.7 <br /> Mine out Phase 1C phase after backfilling Phase 1A. Topsoil and <br /> revegetate Phase 1A. 3.4 <br /> Reclaim most of Phase 1 B and some of Phase 1 C while mining <br /> Phase 2. 5.9 <br /> Reclaim Phase 2 while mining Phase 3. 4.7 <br /> Reclaim Phase 3 while mining Phase 4. End of mining. 2.2 <br /> 17.9 <br /> Cerise Mine <br /> D-3 Lew-icki&Associates <br /> .dune 2021 <br />