Laserfiche WebLink
co�o� <br /> ti $ M2010-058 TR2 ION, MINING AND SAFETY <br /> # �/Compliedl <br /> 0 violations 0203 ph(303)866-3567 F410EI fED <br /> �J876� 1 Minor Infraction ACYlthm+ <br /> *NO PAYMENT INCLUDED WITH THIS TR REQUEST!!-SDT <br /> REQUEST FOR TECHNICAL KL v rawia t f R) COVER SHEET AUG 2 7 2021 <br /> DMSION 01- °�CL.AMAT{ <br /> 2010-058 Cerise Mine Ala <br /> File No.: M- Site Name: MINING t°:. ,GAF-ETY <br /> County Garfield TR# (DRMS Use only) <br /> Permittee: Oldcastle SW Group, dba as United Companies of Mesa County <br /> Operator(If Other than Permittee): <br /> Permittee Representative:Jason Burkey, United Companies and Ben Langenfeld, Greg Lewicki &Associates <br /> Please provide a brief description of the proposed revision: <br /> Change of the mining plans to reflect change in phasing sequence. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 11Od, 112d(1, 2 or 3) $1006 <br />