ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5)and <br /> (6)/4.03.2(5) and(6),Reclamation 4.03.1(7)/4.03.2(7): <br /> Gravel placement was occurring along segments of haul roads throughout the site. <br /> REVEGETATION—Rule 4.15 <br /> Vegetative Cover;Timing: <br /> A shrub test plot was currently being constructed in the West Pit at the time of the inspection. The plot was <br /> observed from the overlook of the West Pit. Topsoil had been placed in the region of the test plot and according to <br /> a Colowyo representative, seeding and tubling placement had not yet occurred.The area plans to be fenced in but <br /> at the time of the inspection,no fencing had been placed yet. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> The mine identification sign was observed at the mine entrance.All information for compliance was present. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil stripping occurred within the Little Collom Gulch prior to the inspection. Topsoil stripping began at the <br /> switchback of the Collom in-pit haul road and moved south within the drainage. Topsoil was stripped from the <br /> base of the channel and up along the side slopes. <br /> V - r <br /> Topsoil stripping within Little Collom Gulch. <br />