Laserfiche WebLink
Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />Y - Roads <br />N - Availability of Records <br />N - Reclamation Success <br />N - Backfill & Grading <br />N - Revegetation <br />N - Excess Spoil and Dev. Waste <br />N - Subsidence <br />N - Explosives <br />N - Slides and Other Damage <br />N - Fish & Wildlife <br />N - Support Facilities On -site <br />N - Hydrologic Balance <br />Y - Signs and Markers <br />R - Gen. Compliance With Mine Plan <br />N - Support Facilities Not On -site <br />N - Other <br />N - Special Categories Of Mining <br />N - Processing Waste <br />Y - Topsoil <br />COMMENTS <br />This was a partial inspection of the Foidel Creek Mine; DRMS Permit No. C-1982-056, operated by Twentymile <br />Coal, LLC. (TC). This inspection was conducted by Tabetha Lynch with the Colorado Division of Reclamation, <br />Mining, and Safety (Division). Overall the weather was clear and hot during the inspection. <br />GENERAL MINE PLAN COMPLIANCE: <br />The trash has been cleaned out of the portal ditch as requested in the previous inspection. <br />The 12L borehole pad was checked for clean-up and reclamation progress. An electric fence has been placed <br />around the 12L pad and topsoil pile. <br />Electric fence at 12L shown above <br />Coal fines have been cleaned up on the pad. <br />- - <br />- li •if� �� ' r� r. <br />12 L borehole is no longer backing up and pad will be reclaimed per operator. <br />