Laserfiche WebLink
Task Description: Distribute topsoil over affected areas Task# 006 <br /> Site: Golden Mine <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: C730 Truck CAT 950 Loader CatD8 Dozer <br /> Unit Cost/Hour: $ 129.72 $ 95.37 $ 191.83 <br /> Unit Production: 18.06 LCY <br /> 201.79 LCY/Hr 528.59 LCY/Hr <br /> MATERIAL QUANTITIES <br /> Initial volume: 34,444 <br /> Swell factor: 1.125 <br /> Loose volume: 38,750 LCY <br /> TRAVEL TIME <br /> Haul distance 1200 ft <br /> Total cycle time 5.37 minutes <br /> JOB TIME AND COST <br /> Fleet size: 1 truck, 1 loader, 1 dozer <br /> Total job time: 96.02 <br /> Fleet cost/hour 416.92 <br /> Total job cost: $ 40,030.79 <br />