My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-19_PERMIT FILE - M2021052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021052
>
2021-08-19_PERMIT FILE - M2021052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 8:22:04 AM
Creation date
8/23/2021 5:24:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
PERMIT FILE
Doc Date
8/19/2021
Doc Name
Completeness Response
From
IHC Scott, Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rill: gravel Pit 4I 4�,gust 2021 <br /> 5.2.3 Mining Extraction (Phase 3— in 2 Stages) <br /> This section describes the mining methods, earthmoving, all water diversions and <br /> impoundments, and size of the areas to be worked during Phase 3. <br /> Phase 3 includes the mining extraction operations which will take place in 2 extraction <br /> stages and include the areas east of the delineated wetlands. Fencing will be installed at <br /> least 10-feet away from the tailwater channel and wetlands to prevent disturbance of these <br /> resources. <br /> Size of Area Worked Stage 1 <br /> The size of area involved with Phase 3 Stage 1 is approximately 18 acres (see Table 1). <br /> Scott Contracting, Inc. will mine the Stage 1 area (see Exhibit D1, Figure 10 and Exhibit <br /> D3 and D4, Figures 12 and 13) and begin reclamation prior to mining Stage 2. <br /> The estimated amount of material anticipated to be mined in Stage 1 is: <br /> • Mine Cut (21-foot-thick cut across the 18-acre Stage 1 area; 1:1 slope) = 499,335 <br /> CY <br /> o Includes approximately 10,719 CY for the berm construction <br /> Size of Area Worked Stage 2 <br /> The size of area involved with Phase 3 Stage 2 is approximately 8.7 acres (see Table 1). <br /> Scott Contracting, Inc. will mine the Stage 2 area (see Exhibit D1, Figure 10 and Exhibit <br /> D3, Figure 12) upon completion of the mining and initiation of reclamation activities for <br /> Stage 1. <br /> The estimated amount of material anticipated to be mined in Stage 2 is: <br /> • Mine Cut (21-foot-thick cut across the 18-acre Stage 1 area; 1:1 slope) = 250,007 <br /> CY <br /> o Includes approximately 6,006 CY for the berm construction <br /> Equipment <br /> This phase will use conventional mining equipment for this phase and include, but not be <br /> limited to, a bulldozer, track-hoe, screening plant, wash plant, crusher, and a 35-ton haul <br /> truck. <br /> 6.2.3.1 Mining Methods and Earthmoving <br /> This phase of the project will include mining, stockpiling of material for screening, washing <br /> and crushing processes. <br /> Scott Contracting, Inc. will proceed with mining during this phase with the Stage 1 area <br /> mining and extraction, reclamation of Stage 1, then mining and extraction of Stage 2, <br /> reclamation of Stage 2. The crusher will be placed at existing grade within the Stage 1 <br /> footprint and as excavation proceeds down to the lowest elevation of the gravel. When <br /> enough material has been excavated in Stage 1, the crusher will be moved to the mining pit <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.