Laserfiche WebLink
Rifle gavel Pat 91 Augiist 2021 <br /> 4.5.2 Ute ladies-tresses 13 <br /> 5.0 Exhibit D—Mining Plan 18 <br /> 5.1 Project Location and Information 18 <br /> 5.2 Mine Facilities and Operation 18 <br /> 5.2.1 Site Development and Grading (Phase 1) 18 <br /> 5.2.1.1 Mining Methods and Earthmoving 18 <br /> 5.2.1.2 Water Diversions and Impoundments 19 <br /> 5.2.1.3 Water Handling. Dewatering, and Permits 19 <br /> 5.2.2 Mining Preparation (Phase 2) 20 <br /> 5.2.2.1 Mining Methods and Earthmoving 20 <br /> 5.2.2.2 Water Diversions and Impoundments 25 <br /> 5.2.2.3 Water Handling and Dewatering 25 <br /> 5.2.3 Mining Extraction (Phase 3—in 2 Stages) 26 <br /> 5.2 3.1 Mining Methods and Earthmoving 26 <br /> 5.2.3.2 Water Diversions and Impoundments 27 <br /> 5.2.3.3 Water Handling and Dewatering 27 <br /> 5.2.4 Explosives 27 <br /> 5.2.5 Schedule of Operations 27 <br /> 5.2.6 Existing or Proposed Roads 27 <br /> 5.2.7 Drainage and Runoff Conveyance 27 <br /> 5.2.8 Reclamation (Phase 4) 28 <br /> 5.3 Mining Timetable 28 <br /> 6.0 Exhibit E—Reclamation Plan 30 <br /> 6.1 Description and Types of Reclamation 30 <br /> 6.1.1 Rule 3.1 —Reclamation Performance Standards and Requirements 30 <br /> 6.1.1.1 Materials Handling 30 <br /> 6.1.1.2 Water—General Requirements 31 <br /> 6.1.1.3 Groundwater—Specific Requirements 32 <br /> 6.1.1.4 Wildlife 32 <br /> 6.1.1.5 Topsoiling 32 <br /> 6.1.1.6 Revegetation 33 <br /> 6.1.1.7 Buildings and Structures 33 <br /> 6.1.1.8 Signs and Markers 33 <br /> 6.1.1.9 Spill Reporting 33 <br /> 6.2 Post-Mining Land Use 33 <br /> 6.3 Implementation of the Reclamation Plan 33 <br /> 6.3.1 Topsoil Segregation, Preservation, and Replacement 34 <br /> 6.3.2 Final Grading 34 <br /> 6.3.3 Seeding 34 <br /> 6.3.3.1 Temporary Seed Mix 34 <br /> 6.3.3.2 Long-Term/Permanent Seed Mix 37 <br /> 6.3.4 Fertilization 37 <br /> 6.4 Revegetation Success Criteria 37 <br /> 6.6 Noxious Weed Control 37 <br /> ii <br />