Laserfiche WebLink
TR-34 to Permit M-1977-342 <br /> Environmental Protection Plan <br /> 19. DISPOSAL OF TAILING AND SLUDGES IN MINE WORKINGS <br /> Tailings are not disposed of in mine workings. Water treatment sludge from the URAD WTP is <br /> hauled off site for disposal. Sediments collected at the Mine water settlers underground are <br /> hauled or pumped to the conveyor and transferred to the Mill with other ore where it is <br /> processed for molybdenum recovery. In past years, some of these sediments have intermittently <br /> been stored in underground drifts. These sediments will either be processed as the drifts are <br /> mined out in the future or will remain in place. Since the sediments are of the same mineral <br /> composition as the ore body, no discrete impacts or management is anticipated. <br /> Climax Molybdenum Company August,2021 <br /> Henderson Operations Page 44 of 45 <br />