Laserfiche WebLink
TR-34 to Permit M-1977-342 <br /> Environmental Protection Plan <br /> 15. CONSTRUCTION SCHEDULE INFORMATION <br /> 15.1 Existing EPFs <br /> Construction schedules are determined whenever an EPF is changed or updated (see Appendix A <br /> List of DRMS Permit Amendments and Technical Revisions). Henderson will continue to follow <br /> this method of updating and modifying EPFs when observations, changing operational <br /> requirements or environmental conditions warrant. <br /> 15.2 New EPFs <br /> Mill WTP <br /> As discussed in Section Sections 2.2, 7.2.1 and 15.2, the final design of the Mill WTP is underway <br /> and is expected to be completed in 2021.Construction timing will be dependent on water balance <br /> and operational needs, with start date anticipated in 2022 or 2023, and operations beginning <br /> between 2022-2024. <br /> Climax Molybdenum Company August,2021 <br /> Henderson Operations Page 40 of 45 <br />