Laserfiche WebLink
TR-34 to Permit M-1977-342 <br /> Environmental Protection Plan <br /> 3. Provide assurance that the provisions of CDPS General Permit for Stormwater Discharges <br /> Associated with Metal Mining Operations and ancillary activities are met. <br /> Two formal site inspections(one in the spring and one in the fall) are performed and documented <br /> to satisfy annual reporting requirements. These inspections are conducted by site personnel and <br /> include a review of: <br /> • All disturbed areas; <br /> • Areas used for material storage or handling that are exposed to precipitation; and <br /> • Other areas with potential sources of pollution. <br /> The inspections: <br /> • Look for evidence of, or the potential for, pollutants entering the drainage system; and <br /> • Review the adequacy and upkeep of stormwater management measures, sediment and <br /> erosion control measures, and other BMPs identified in the SWMP. <br /> Spill response equipment is regularly inspected and maintained as a part of the Mine and Mill <br /> SPCC Plans. <br /> Conditions not conforming to the SWMP are proactively managed and corrected. If a revision of <br /> the SWMP is required, such revisions are made and implemented promptly. A copyof the current <br /> SWMPs can be provided upon request. <br /> Climax Molybdenum Company August,2021 <br /> Henderson Operations Page 35 of 45 <br />