Laserfiche WebLink
TR-34 to Permit M-1977-342 <br /> Environmental Protection Plan <br /> List of Tables <br /> Table 3-1 Environmental Protection Measures and Monitoring Required by Other Agencies <br /> Table 4-1 Other Permits and Licenses <br /> Table 5-1 Designated Chemicals Used at the Henderson Mine <br /> Table 5-2 Designated Chemicals Used at the Henderson Mill <br /> List of Figures <br /> Figure 1: Henderson Mine General Site Layout, EPFs 1.1, 1.2 and 1.3 and Designated Chemical Storage <br /> Figure 2: Henderson Mill General Site Layout <br /> Figure 3: Henderson Mill EPFs 1.1, 1.2 and 2.1—2.10—East Branch Reservoir System, Mill Process Water <br /> Storage Tanks and Designated Chemical Storage <br /> Figure 4: Henderson Mill EPFs 1.3, 1.4, 1.5, 1.6, 1.7, 1.8 and 3.1—Tailing Delivery System,Tailing Storage <br /> Facility,Seep Water Collection/Return,Groundwater Extraction System,Ute Park Pump Station, <br /> Stormwater Diversion System and Mill WTP <br /> List of Appendices <br /> Appendix A List of DRMS Permit Amendments and Technical Revisions <br /> Appendix B Incident Response Manuals <br /> Appendix C SDS Sheets for Designated Chemicals <br /> Appendix D Climatic Data <br /> Appendix E Geochemical Analyses of Waste Rock Used For Railroad Haulage Construction (1995) <br /> Climax Molybdenum Company August,2021 <br /> Henderson Operations Page iii of iv <br />