My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-17_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2021-08-17_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 4:47:39 PM
Creation date
8/17/2021 3:46:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
8/17/2021
Doc Name
Adequacy Review Response
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR34
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Molybdenum Company HENDERSON MINE SWMP <br /> Empire, CO April 2021 <br /> 11.0 SWMP REVIEWS, REVISIONS OR CHANGES <br /> 11.1 Division Review <br /> The Colorado Water Quality Control Division (Division) reserves the right to request and <br /> review the plans, and to require additional measures to prevent and control pollution, as <br /> needed. Upon review of the SWMP, the Division may notify the permittee at any time that <br /> the Plan does not meet one or more of the minimum requirements of the permit. After such <br /> notification, changes shall be made and an updated Plan including requested changes shall be <br /> submitted to the Division. Unless otherwise provided, the permittee shall have 30 days after <br /> such notification to both make and implement the necessary changes to the Plan. <br /> 11.2 Permittee Review/Change <br /> Henderson shall amend this SWMP whenever there is a change in design, construction, <br /> operation, or maintenance, which has a significant effect on the potential for the discharge of <br /> pollutants to the waters of the State, or if the SWMP proves to be ineffective in achieving the <br /> general objectives of controlling pollutants in storm water discharges. If existing BMPs need <br /> to be modified or if additional BMPs are necessary, the Plan changes and implementation <br /> must be completed before the next anticipated storm, or not more than 60 days after: the <br /> change in design, construction, operation, or maintenance; or the SWMP has been determined <br /> to be ineffective, unless this time frame is extended by the Division. Amendments to the Plan <br /> shall be summarized in the Annual Report. <br /> Page 11-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.