My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-17_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2021-08-17_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 4:47:39 PM
Creation date
8/17/2021 3:46:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
8/17/2021
Doc Name
Adequacy Review Response
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR34
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Molybdenum Company HENDERSON MINE SWMP <br /> Empire, CO April 2021 <br /> work. <br /> • General and activity/site-specific BMP measures, including the following: <br /> ■ Sediment and Erosion Control Measures; <br /> ■ Spill Prevention and Response Procedures; <br /> ■ Good Housekeeping and Materials Handling; and <br /> ■ Preventive Maintenance. <br /> • Site drainage with an emphasis on: <br /> ■ Process water boundaries; <br /> ■ Location of storm water outfalls; and <br /> ■ Location of specific potential pollution sites and affected outfall. <br /> • Inspection and implementation requirements. <br /> • Possible enforcement actions resulting from non-compliance. <br /> Henderson utilizes multiple training forums to provide adequate training, including: <br /> Training Forum I Description <br /> New Hire Orientation This training includes SWMP introduction, spill <br /> (within 30-days of hiring) Prevention/response, good housekeeping, and hazardous <br /> materials management. <br /> Contractor Awareness The contractor environmental pamphlet and awareness <br /> training video provides SWMP introduction, spill <br /> Training (prior to beginning work on-site) prevention/response, good housekeeping, and hazardous <br /> materials management. <br /> On the Job (continual) This training includes area and job specific storm water BMP <br /> measures and drainages. <br /> Environmental Refresher This training reinforces SWMP components and goals, mine <br /> Training -Employees and operations and control features utilized to prevent storm water <br /> Contractors (annual) contamination from occurring. <br /> Additional training shall be provided to affected employees when a new hazard is introduced <br /> that could potentially affect storm water management. <br /> Records of training are maintained by the Environmental Department or the Human Resources <br /> Department. <br /> Page 5-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.