My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-17_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2021-08-17_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 4:47:39 PM
Creation date
8/17/2021 3:46:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
8/17/2021
Doc Name
Adequacy Review Response
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR34
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-34 to Permit M-1977-342 <br /> Environmental Protection Plan <br /> 2. DESCRIPTION OF SITE AND SITE FIGURES <br /> 2.1. Henderson Mine & URAD Water Treatment Plant <br /> The Henderson Mine is an underground mining operation that extracts molybdenite ore from <br /> beneath the base of Red Mountain and transports it via conveyor through a 9.6 mile tunnel and <br /> 5 mile overland conveyor to the Henderson Mill for milling and flotation concentrating. The final <br /> product is molybdenum disulfide (MoS2) concentrate that is transported out of the state for final <br /> processing. <br /> The Mine is located on the north side of Red Mountain near the confluence of Butler Gulch and <br /> the West Fork of Clear Creek. It is 9 miles west of Empire, Colorado, in Clear Creek County on the <br /> eastern slope of the Continental Divide.The elevation at the mine site is 10,400 feet above mean <br /> sea level (AMSL). Facilities at the mine site include shafts, support facilities, storage yards, the <br /> subsidence area on Red Mountain, the water conveyance pipeline between the Mine and URAD, <br /> and the URAD Industrial Water Treatment Plant (WTP). <br /> 2.2. Henderson Mill <br /> The Mill is located in Grand County, Colorado in the upper Williams Fork River valley <br /> approximately 22 miles south of Parshall, Colorado. The Mill site and all facilities are on the <br /> western side of the Continental Divide in the upper Colorado River drainage basin. Facilities <br /> include the portal and conveyor, mill complex, and the tailing storage facility (TSF). An industrial <br /> WTP at the Mill (the Mill WTP) is currently in the design phase, and construction is planned <br /> between 2022 and 2024, depending on climatic conditions and water balance. <br /> Physical and environmental descriptions of the Mine and Mill site including location maps are <br /> found in the Reclamation Permit (Sections 2 and 6) as modified. Section B of the Reclamation <br /> Permit shows the general location of the Henderson Mine and Mill. <br /> 2.3. Site Figures <br /> • Figure 1: Henderson Mine General Site Layout, EPFs 1.1, 1.2 and 1.3 and Designated <br /> Chemical Storage - Illustrates the general site layout of the Mine and the location of <br /> surrounding water bodies; and the location of the EPFs associated with the mine water <br /> and URAD WTP,stormwater diversion system, Pond 1.2 and designated chemical storage. <br /> • Figure 2: Henderson Mill General Site Layout - Illustrates the general site layout of the <br /> Mill and the locations of surrounding water bodies. <br /> • Figure 3: Henderson Mill EPFs 1.1, 1.2 and 2.1 — 2.10 — East Branch Reservoir System, <br /> Mill Process Water Storage Tanks and Designated Chemical Storage - Illustrates the <br /> locations of the Henderson Mill EPFs associated with the East Branch Reservoir system, <br /> the process water storage tanks, and designated chemical storage. <br /> • Figure 4: Henderson Mill EPFs 1.3,1.4, 1.5, 1.6, 1.7, 1.8 and 3.1—Tailing Delivery System, <br /> Tailing Storage Facility,Seep Water Collection/Return,Groundwater Extraction System, <br /> Ute Park Pump Station, Stormwater Diversion System and Mill WTP - Illustrates the <br /> Climax Molybdenum Company August,2021 <br /> Henderson Operations Page 3 of 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.