Mr. Peter Hays <br /> TR-34—Environmental Protection Plan, Adequacy Review Response <br /> August 12, 2021 <br /> In addition to the above items, Henderson has also addressed items 7 and 8 per your related email <br /> requests on July 22, 2021. Your comments are included below in italics, followed by Henderson's <br /> response. Item 9 relates to a recent adjustment to Nokes dosing. <br /> 7. The description of the function of J Pond at the URAD WTP in the revised EPP differs from what <br /> we discussed in the field. Please review the wording for the J Pond description on page 15 of the <br /> revised EPP to verify the wording is accurate. <br /> Henderson has revised the last paragraph of Section 7.1.1 - Mine EPF 1.1 — Mine Water& URAD <br /> Water Treatment System (Page 18) of the EPP to clarify the function of J Pond. <br /> 8. The revised EPP states, "A stormwater diversion system has been constructed on the south side <br /> of the Mine office and surface operations to divert un-impacted stormwater around industrial <br /> activities to the east end of the property." on page 22 and "Diversion ditches have been <br /> constructed on the south side of the Mine office and surface operations to divert water around <br /> industrial activities to the east end of the property."on page 36. <br /> Please confirm the ditch conveys water from Butler Gulch east to the West Fork of Clear Creek. <br /> It appeared during the inspection the old adit was the diversion point for the ditch with water <br /> flowing from the adit west to Butler Gulch and east to Clear Creek. Please confirm the flow <br /> direction(s) and update the EPP accordingly. <br /> Henderson has revised the first paragraph of Section 7.1.1 - Mine EPF 1.2 — Stormwater <br /> Diversion System (Page 18) and the last bullet in Section 10.1 (Page 34) of the EPP to confirm <br /> flow directions within the diversion ditch. <br /> 9. Henderson identified an issue with the Nokes dosing calculations during a recent review. As <br /> such, the dosing rate has been updated in Table 5-2: Designated Chemicals Used at the <br /> Henderson Mill of the EPP from 0.2 Ibs/ton to 0.6 Ibs/ton. <br /> Included with this submittal are two compiled pdfs: <br /> • Henderson Adequacy Review Response - The specific EPP pages and Figures that have been <br /> revised, SDSs for new designated chemicals, Mine and Mill SWMPs and the IRM Table of <br /> contents, as noted above. <br /> • Henderson EPP Complete -As a convenience, a complete EPP package with all new information <br /> incorporated. <br /> If you have any questions regarding this submittal, please contact me at (720) 942-3255. <br /> Sincerely, <br /> Miguel Hamarat <br /> Environmental Manager <br /> Climax Molybdenum Company <br /> Henderson Operations <br /> Enclosures: <br /> 1. Henderson Adequacy Review Response (compiled pdf) <br /> 2. Henderson EPP Complete (compiled pdo <br /> cc(via email) <br /> G. Niggeler, Climax <br /> Page 3 <br />