Laserfiche WebLink
PHASE 1 WORK SHEETS, after CIRCES format: <br /> SCRAPER WORK <br /> PROJECT IDENTIFICATION <br /> Task#: 110 <br /> Date: 6/29/2021 <br /> State: Colorado <br /> County: Fremont <br /> File Name: M1977-193 TRIO <br /> HOURLY EQUIPMENT <br /> Scraper Cat 631 G <br /> Cost Breakdown: <br /> %Utilization- machine 83% <br /> Ownership Cost/hr. $147.77 <br /> Operating Cost/hr. $141.36 <br /> Operator Cost/hr. $30.90 <br /> Unit Subtotal $302.03 <br /> No. of units 1 <br /> Total work team cost: $302.03 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 108.35 acres of final pit floor disturbance + 13.69 acres of permanent <br /> fines storage pile acreage + 1.29 acres of haul roads to main gate and lower shop= 123.3 <br /> acres total of phase 1 area 12"deep. (Tezak survey/AutoCAD data) <br /> 123.3 x 43,560 cu ft. acre/27 cu ft. /cu yd. = 198,924 cubic yards <br /> Swell Factor 1.125 <br /> Loose Volume: 223,790 cubic yards <br /> Tonnage @ 2178/acre 268,547.40 tons <br /> Source of swell factor: Cat Handbook <br /> 3 <br />