Laserfiche WebLink
DEMOLITION WORK <br /> Task Description: Permanent Structure Demolition <br /> Task#: 170 <br /> Statement: Tezak Heavy Equipment accepts detailed spread sheet of structures, <br /> quantities, and costs for demolition as noted in the 2013 bond calculation for Task#170 <br /> plus 10% increase for inflationary impacts. <br /> Adjusted Total Cost, 2013 $60,597.00 <br /> 10% increase $6059.70 <br /> 2021 Demolition Cost Estimate $66,656.70 <br /> 13 <br />