My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-10_REVISION - M1977193
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2021-08-10_REVISION - M1977193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 1:19:44 PM
Creation date
8/11/2021 6:01:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Revision
Doc Date
8/10/2021
Doc Name
Request for Technical Revision
From
Tezak Heavy Equipment
To
DRMS
Type & Sequence
TR10
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER DITCH MAINTENANCE WORK <br /> Task Description: Phase 1 Bench Ditch Maintenance (5 benches x 3300' x 12') <br /> PROJECT IDENTIFICATION <br /> Task#: 150 <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: D-5 Bulldozer <br /> Ripper Attach no <br /> Horsepower 175 <br /> Shift basis 1/day <br /> Cost Breakdown: Utilization% <br /> Ownership Cost/Hour Estimate........ $36.53 NA <br /> Operating Cost/Hour Estimate......... $36.50 75 <br /> Ripper Cost/Hour 0 <br /> Operator Cost/Hour $30.90 NA <br /> Total Unit Cost/Hour $103.93 <br /> MATERIAL QUANTITIES <br /> Total area to be graded: 3300' x 12' x 5 /43,560 =4.55 acres <br /> Source: five benches 3300' x 12' <br /> HOURLY PRODUCTION <br /> Average Dozer Speed: 1.0 mph <br /> Selected Application: Finish Grading (0-2.5 mph)— 1.5 <br /> Selected Blade Angle NA <br /> Effective Blade Length: 10.7 feet <br /> Width of blade overlap per pass 0 feet <br /> Net grading per pass 10.7 feet <br /> Unadjusted Hourly Unit Production 1.25 acres/hour <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.