Laserfiche WebLink
04.cow <br /> M2002-118 TR10 <br /> COLOR Complied! [INING AND SAFETY <br /> � * II 0 Violations 03) 866-3567 <br /> 'r 1876 27 Minor Infractions iE/mac/awa <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1977-193 site Name:T. H .E. Aggregate SjWM, <br /> V M10 <br /> county Fremont TR# l <br /> YJ <br /> Permittee:Tezak Heavy Equipment Co. , Inc. YW I Mltmn U 4iwuwrinN <br /> MINING&SAFETY <br /> Operator (If Other than Permittee): <br /> Permittee Representative: R a n d y D I L.u z l o <br /> Please provide a brief description of the proposed revision: <br /> The Permittee is requesting a Technical Revision for re-evaluation of the reclamation bond as a result of the mine <br /> phasing that was established in the previous Amendment 05, to allow for continued advancement of mining efforts. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction 0 <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, I I2d(l, 2 or 3) $1006 ❑ <br />