Laserfiche WebLink
Percentages <br /> State N/A Federal N/A Local Agency N/A <br /> 17. What post mining land uses will be made of the extraction and why? (This <br /> question helps us determine the intent of the activity.) <br /> Currently there are no development plans for the land after excavation and <br /> reclamation, but the land has set uses as accepted in the land's Planned <br /> Unit Development (PUD). <br /> 18. What types and sizes of equipment will be used in the extraction? <br /> Scrapers: CAT 627, 637, or 657 <br /> Excavators: Any available size <br /> Haul Trucks: Articulated haul trucks, any available size <br /> Dozers: Any available size <br /> Please send the completed questionnaire to the Division at the address above for review. <br /> The Board has directed the Division to make a decision based on the information you have <br /> supplied. We trust that the activities will be performed as represented. If we receive a <br /> complaint, we are required by law to conduct an inspection of the site. Which could result <br /> in a violation, a cease and desist order, and other corrective actions including submittal of <br /> a permit application. <br /> If you have any questions, please contact the Division at (303)866-3567. Please feel free <br /> to visit our web site at: https:Hcolorado.gov/drms for further access to the full Act and <br /> Rules governing extraction of metals, non-metals, and construction materials in the State <br /> of Colorado. <br /> Sincerely, <br /> Division of Reclamation, Mining and Safety Staff <br /> Enclosure: Rule 1.2 excerpt for Hard Rock Metal Mines and Construction Materials <br /> Rule 1.2 excerpt for Hard Rock/Metal Mining <br /> Page 4 of 6 <br />