Laserfiche WebLink
Percentages <br /> State © Federal Local Agency <br /> 17. What post mining land uses will be made of the extraction and why? (This <br /> question helps us determine the intent of the activity.) <br /> -F'k'e 1 C"'d is Le aAj \+01_'V <br /> -` V"p— �` ►" I'\4-r�� k V1 F_ C c� ti OX CCU S©W1. �M Y <br /> - - �1 <br /> r�S v)cl 5a.A e k�Y\c\.sLiJ3v r&La yy �14 'e Y-Ca 'c,_+ to ✓1 <br /> U' i i - , l `' '� c�` �tl _t1S � c1 j P1'\ ems. ,,n - <br /> 18. What types and sizes of equipment will be used in the extraction? <br /> I , <br /> S� V'�e.� f->uc�l C,o\ n(5zz l e_ e to iite, c <br /> C4 e <br /> Please send the completed questionnaire to the Division at the address above for review. <br /> The Board has directed the Division to make a decision based on the information you have <br /> supplied. We trust that the activities will be performed as represented. If we receive a <br /> complaint, we are required by law to conduct an inspection of the site. Which could result <br /> in a violation, a cease and desist order, and other corrective actions including submittal of <br /> a permit application. <br /> If you have any questions, please contact the Division at (303)866-3567. Please feel free <br /> to visit our web site at: https:Hcolorado.gov/drms for further access to the full Act and <br /> Rules governing extraction of metals, non-metals, and construction materials in the State <br /> of Colorado. <br /> Sincerely, <br /> Division of Reclamation, Mining and Safety Staff <br /> Enclosure: Rule 1.2 excerpt for Hard Rock Metal Mines and Construction Materials <br /> Rule 1.2 excerpt for Hard Rock/Metal Mining <br /> Page 4 of 6 <br />