My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-06_PERMIT FILE - M2021052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021052
>
2021-08-06_PERMIT FILE - M2021052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 8:03:03 AM
Creation date
8/9/2021 6:27:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
PERMIT FILE
Doc Date
8/6/2021
Doc Name
Application
From
Scott Contracting, Inc.
To
DRMS
Email Name
ACY
THM
AWA
SMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2021 <br /> 4.5.2 Ute ladies'-tresses 13 <br /> 5.0 Exhibit D — Mining Plan 18 <br /> 5.1 Project Location and Information 18 <br /> 5.2 Mine Facilities and Operation 18 <br /> 5.2.1 Site Development and Grading (Phase 1) 18 <br /> 5.2.1 1 Mining Methods and Earthmoving 18 <br /> 5.2.1.2 Water Diversions and Impoundments 19 <br /> 5.2.1.3 Water Handling, Dewatering, and Permits 19 <br /> 5.2.2 Mining Preparation (Phase 2) 20 <br /> 5.2.2.1 Mining Methods and Earthmoving 20 <br /> 5.2.2.2 Water Diversions and Impoundments 25 <br /> 5.2.2.3 Water Handling and Dewatering 25 <br /> 5.2.3 Mining Extraction (Phase 3— in 2 Stages) 26 <br /> 5.2.3.1 Mining Methods and Earthmoving 26 <br /> 5.2.3.2 Water Diversions and Impoundments 27 <br /> 5.2.3.3 Water Handling and Dewatering 27 <br /> 5.2.4 Explosives 27 <br /> 5.2.5 Schedule of Operations 27 <br /> 5.2.6 Existing or Proposed Roads 27 <br /> 5.2.7 Drainage and Runoff Conveyance 27 <br /> 5.2.8 Reclamation (Phase 4) 28 <br /> 5.3 Mining Timetable 28 <br /> 6.0 Exhibit E— Reclamation Plan 30 <br /> 6.1 Description and Types of Reclamation 30 <br /> 6.1.1 Rule 3.1 — Reclamation Performance Standards and Requirements 30 <br /> 6.1 1 1 Materials Handling 30 <br /> 6.1 1.2 Water— General Requirements 31 <br /> 6.1 1.3 Groundwater— Specific Requirements 32 <br /> 6.1 1.4 Wildlife 32 <br /> 6.1.1.5 Topsoiling 32 <br /> 6.1.1.6 Revegetation 33 <br /> 6.1 1.7 Buildings and Structures 33 <br /> 6.1.1.8 Signs and Markers 33 <br /> 6.1 1.9 Spill Reporting 33 <br /> 6.2 Post-Mining Land Use 33 <br /> 6.3 Implementation of the Reclamation Plan 33 <br /> 6.3.1 Topsoil Segregation, Preservation, and Replacement 34 <br /> 6.3.2 Final Grading 34 <br /> 6.3.3 Seeding 34 <br /> 6.3.3.1 Temporary Seed Mix 34 <br /> 6.3.3.2 Long-Term/Permanent Seed Mix 37 <br /> 6.3.4 Fertilization 37 <br /> 6.4 Revegetation Success Criteria 37 <br /> 6.5 Noxious Weed Control 37 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.