Laserfiche WebLink
MED DRILL <br />PIPELINE <br />O <br />\ <br />E7 <br />F6 <br />PIPELINE <br />00 O <br />to <br />E8Aq o �� <br />r. O <br />Existing Road <br />— 150' Straw Wattles <br />—200' Straw Wattles 0 <br />Top50115tockplle E9 <br />I � <br />Drainage Ditch <br />I <br />Rock Lined Sump <br />---2GO' Straw Wattles <br />ARCHEOLOGY BUFFER <br />AREA - G.0 ACRES <br />150' Straw Wattles <br />Drainage Ditch <br />Borehole <br />Rock Lined Sump <br />Drainage Ditch <br />It <br />EXISTING RANCH ROAD <br />2930' <br />TUF HDFE LINE <br />COUNTY ROAD # 27 <br />UNDERPASS AND ON RA <br />( COUNTY RESPONSIBILITY <br />WITHIN COUNTY RIGHT -OF -WA <br />O <br />COUNTY ROAD # 27 <br />OFF RAMP <br />( COUNTY RESPONSIBILITY <br />WITHIN COT Y RIGHT-OF-WAY) <br />TOPSOIL STOCKPILE <br />R.R. POND T <br />CULVERT <br />42" CMP To <br />DIVERSION DITCH <br />TOPSOIL STOCKPILE <br />18" CMP <br />O <br />O O 6A <br />2-1 2" CMP5 <br />TOPSOIL STOCKPILE <br />ACCESS ROAD <br />ARCHEOLOGY BUFFER - 4.G ACRE5 <br />ROCK CHECK <br />_ Z ROCK CHECK <br />5WMD 13OREHOLE5 I DRAINAGE DITCH <br />I I <br />—3255TRAW WATTLES - <br />501L PILE L 1.0 ACRE PAD <br />6 RT THICKENER <br />SCR # PIPELINE <br />G� <br />POWER LINE �6 <br />TO ELECTRICAL <br />BOREHOLE ° <br />ITOPSOIL STOCKPILE <br />° <br />MINE ENTRANCE <br />� rCh <br />F� <br />LOCATION I <br />c <br />ELECTRICAL SHOP c <br />oq <br />YVEA AUTOMAT C <br />oQ� SWITCHING T <br />pF METERING STATION <br />� ELECTRICAL <br />STORAGE BUILDING TOP50 L STOCKPILE <br />MATERIAUEQUIPMENT <br />SURPLUS STORAGE <br />AREA <br />WASTE STORAGE / STAGING AREA <br />° BOREHOLE PUMP <br />SUBSTATION <br />$ F TRAIN WEIGH SCALES 36"CMP + <br />FALLING ROCK MITIGATION PIT LONGWALL STAGING AREA <br />G" WATER TCC SHOP <br />OPp 2'7 �N C4 F-2-D LINE ACCESS ROAD <br />COVN� LOCATION 5 �cp ° o $ <br />3"PVC 5CH 80 a <br />G PT HEMERA SP NGS <br />IICKENER G e 2 WATER LINE ACCESS / HAULROAD <br />PIPEL <br />° O PUMP OUS <br />2MN 6RT O.B. 18" WASTEWATER <br />THICKENER BOREHOLE CMP CONTROL BUILDING <br />° o ° 36"CMP dG-2 <br />FRESH H2O BOREHOL S a EFFLUENT LINE 0o O G <br />LAB TRAILERS <br />° ° BORROW 06G� <br />EQUIPME /MATERIAL WATER LINES AREA or <br />STORAGE REA5 ch <br />3 WASTE RE W NK <br />LOCATION G PONDS <br />° INSPECTION WASTEWATER TE CISTERN <br />MANHOLE <br />cm w MINE RE5CU RAILER <br />w \ SECURITY BUILDING <br />° w GA LINE STORAGE DITCH <br />T K AND FUELING CONCRETE BARRIERS <br />HAUL ROAD 13-2 Q NCRETE -y CMP I TALLATION CRASH PROTECTION (1 0) <br />S OKER COAL DRIVEWAY o o TRUCK SCALE (STEEL PIPE = CONCRETE) <br />8" CMP <br />STORAGE 4ND �F p AONCR o U/G ROCK FI POWERLINE G \Pl <br />DRG s W LOADOUTAREA ° ATH = (LIGHT uI BULK ROC \\ AND POWER POLES OdG� <br />RAILROAD E-Z HOUSE SHOP DUST <br />° OTGr 0 1 TANK 0 PROPANE TANK SPUR <br />AND LINE <br />THICKENER TL P P�yy°R oP NPNc� y �2\ � o o 0 <br />UNDERFLOW $o}^GMP u° e� �Owo ° <br />PIPELINE �NeeO cP��ON m° 5 8 <br />ro`eVO ESEL STORAG o EXISTING JERSEY BARRIERS <br />0� � O��G TANK AND FUELING °.I. <br />o o 5TALLATION / BURIED 41 GO PAVED PARKING AREAS <br />"STI WASH BAYLOCA O 7 °_ oFF PIPE HYDRANT <br />y 206000 GAL. O cn�PrNo _—TRANSFORMER <br />o <br />ILL HOUSE <br />LOCATION I I AN oUTILITY BULDI f 5H I-ANK P NONc°P <br />D15CHA o TRAINING TRAILER <br />o 0 ENTRY WATER BOp�H v pytE UNe EL 5UMP <br />L <br />0 E2 RED LINE BO E ENGINEERING TRAILER <br />I P 5T ECTRICAL / 0 ENTRY TRSF 15"5TL n COMPLIANCE TRAILER <br />A o NO' <br />PIPELINE 09 ° pt <br />0 0 0 DISCHARGE o2_ Q <br />° 0° <br />Si <br />HAUL ROA -2 / -SUBSTATION _ _ PORTAL EXTENTION <br />( COAL F ILITIES INTERSECTION FACILITIES L FIBER OPTIC BOREHOLE <br />PREVIOUS SITE OF TO RR SING) RECLAIM TUNNEL DROP INLET LIN o-si <br />Oo/ MANTRIP PARKING AREAS <br />BROWN PALACE STOKER PIL 8 ° PLA5T-. BOX 5uMP EQUIPMENT / MATERIAL <br />OFFICE BUILDING LOADING EA / / w ` �\ REGVOLTAGE <br />ULATOR \STORAGE AREA <br />CONV R DISCHARGE / LP FUEL TANK <br />TO ST ER PILE + CLAIM NNEL_ , FIRE HYDRANT <br />2� # LOCATION 2 SUMP 5CHAKGE <br />COp"SY ?-ONO <br />B CC TROLENINGMCCNON GOAL) <br />BUILDING % 500 M �N <br />FICE BUILDING ( <br />O ASH PLANT ROM STOCKPILE WASTE AREA <br />TIE-IN LOCATION STATIC THICKENS o <br />8 � p LOCATION R RECLAIM <br />3 5W TUE 150KEHOLE U15TING ANDSU6 TONE P CON OR <br />P\PE THICKNER UNDERFLOW � FAN <br />CONVEYOR <br />TRAN5F0 CYAl) 2- G" HDPE PI FRESH H2O BOREHOLE <br />E WPV ROCK FILTERS W STORAGE STACKER TUB <br />BO 2p0, pOU6\ ° � T BUILDIN PUMP 22" POLY SLOPE BELT DRIVE BLD. <br />° FILL AREA G s SUMP OLD TRANSFER BLD. <br />° o O ROCK FI ERS <br />I '"I <br />WAL SUMP PAD 20' x 20' <br />dG ROCK MITIGATION PIT HAUL ROAD "C" (b ss"CMP / 2-30 GO" RAW COAL CURRENT LOC ON OF PROCESS TECHNOLOGY <br />15MALL AREA (RE:TO PERMIT C-82-05G) 5TL.PIPE RUN -OF -MINE ( ROM ) STOCKPILE MODEL CA -5 ASH ANALYZER <br />EXEMPTION (5AE) ELE UMP ING GO" PLANT FEE LT DIESEL STORAGE TANK AND <br />BATCH WEIGH O TRANSFER NG 48LHAUL ROAD C ROCK FILTER DAM - FUELING INSTALLATION PAD x 38' <br />+ DRAIN LINE i <br />o (ROM COAL AREA 2-48"CMP -\ � , SEER BUILDING <br />RETAINING TO RR CROSSING) Q�48" REFU CONVEYOR OUTSIDE <br />WALL -42°CMP �N Grp 2 200 N REFUSE BIN STORAGE AREA DRIVE BUILDING <br />FREEZE -PROOFING 0 SI o <br />APPLICATION SITE BATCH WEIGH piTcn nRc.I CK CHECK DAM O / 3 <br />O HAULROAD O DE ORROW O GNO MINE ENTRANCE PORTAL TOPSOIL STOCKPILE <br />O PIPELINE VOGP�\ T SOIL ST AREA <br />BURIED DRAINAGE =6 REJECT BELT <br />STOCKPILE <br />TRUCK SCALES PIPE * FIBER-OPTIC LINE w / ROCK FILTERS �OGP�\ N SLOPE HEATER <br />PUMP BOOST <br />STATION LOCATION 24"CMP R THICKENER U RFLOW <br />42"CM ° 12"CMP MPORAKY STORAGE A51N <br />WN SUN CLEAN -OUT RAMP RUN -OF -MINE ( ROM ) <br />O O TRUCK LOADOUT 8"CM o °arc MATERIAL STORAGE YARD <br />O O \ o h4a °�,-. <br />WEST HAULROAD 3-42" POND C _ <br />+ ( HAULROAD A) CMP 2"CMP <br />HAULROAD 8"C <br />SUMP SAE) a` cN HAUL ROAD 5-1 <br />0 EXTENSION - <br />BERM _ ° ° P e <br /># CK PIL R 12 = VE TIVE ILTEP OSGr� FRESH WATER <br />TOPSOI L STOCKPILE RECOVERY <br />FRENCH DRAIN C) 6"CMP PIPELINES <br />OV NO BELT <br />TEMPORARY STORAGE PONDS B D-I-E ° ALL AREA TRANSFORMER <br />I8"CMP 4"CMP 26"CMP EXEMPTION (SAE) HAUL ROAD 3-1 <br />TRANSFORMER ( ROM COAL A TO REFUS FRESH WATER REFUSE HAUL ROAD <br />HAUL ROAD[ R5ECTION) ( COAL FACILITIES INTERSECTION <br />RECOVERY TO REFUSE AREA BOUNDARY) <br />LOCATION B TRAIN BATCH WEIGH DOUT PUMP LOCATION <br />STORAGE LOCATION 4 ° <br />E55 ROAD MET STATION <br />SUMP TRAIN LOADOUT TRANSFER CONV OR WASTE ROCK REFUSE <br />LPROAD <br />TEMP.LAB D- L- SUBSTATION <br />TOPSOIL STOCKPILE <br />8"5TL v 8"CMP <br />LP FUEL TANK DISPOSAL AREA (HISTORIC /FUTURE ) <br />b 8"CMP AREA I PIT TEMPORARY WATER STORAGE <br />IMPOUNDMENT (CURRENT) <br />24"CMP U P <br />DRY STORAGE BUILDING ST 1-B <br />OSGrO BLDG OVERBURDEN STOCKPILE <br />( INACTIVE ) <br />UCK LO OUT <br />MATERIAL STORAGE AREAS CAT A RAN5FER CONVEYOR <br />e EMERGENCY <br />FAN ESCAPE TUNNEL <br />CRDA PERIMETER <br />DRAINAGE DITCHES <br />BOB TRANSFER BUILDINGS 24' COAL STOCKPILE LOADOUT <br />D-I- <br />OIL SHED STACK TUBE <br />ROM COAL STORAGE AREA PUMP HOUSE STACK BELT <br />36"CMP <br />DIESEL FUEL RECLAIM TUNNEL <br />STORAGE ESCAPE TUBE <br />TRAIN LOADOUT TRANSFER CONVEYOR <br />MAGNET LOCATION <br />EXISTING SAMPLE <br />BUILDING <br />BELT OUT BACK <br />(BOB) <br />MCC BLDG. <br />STOKER OIL TANK <br />AND CONTAINMENT <br />DIESEL STORAGE TANKS <br />AND FUELING INSTALLATION <br />MATERIAL STORAGE <br />EXPLOSIVES MAGAZINE LOCATION <br />PUMP HOUSE LOCATION <br />2-18" CMP <br />FIRE HYDRANT <br />8" CMP <br />0 0 <br />TRUD^S CORNER <br />(SAE) <br />STORAGE AREA <br />o eo <br />ACCE55 <br />�I <br />\ LOCATION <br />0 <br />o L <br />��TCh <br />Rt)q_ le <br />1 <br />FUEL STORAGE <br />\ I COVER MATERIAL <br />STOCKPILE <br />TOP501L STOCKPILE <br />Is <br />R/ <br />LLJ <br />z <br />ROCK DUST TANK <br />No. 2 <br />ROCK DUST TANK <br />No. I <br />TRUCK ACCESS <br />UNLOADING PAD <br />O <br />SMALL AREA <br />' EXEMPTIO <br />TOPSOIL STOCKPILE <br />I MILLION GAL <br />H2O TANK <br />o <br />PUMP HOUSE <br />o <br />° ° °o + PUMP HOUS <br />o $ r <br />0 1\ <br />FOIDEL SCHOOL <br />OUT BUILDING <br />00 <br />OF'F LOADING <br />POINT <br />BELT 5TRUC <br />YARD <br />\+ <br />$ \ <br />TOPSOIL TOC PILE <br />1 5"CMP <br />o <br />G-3-A <br />24"CMP <br />/ <br />m <br />m <br />ro � <br />0 <br />G-1-B <br />GO"CMP <br />\ G-I -A <br />42"CMP <br />0 <br />o <br />MAP LEGEND <br />REV15ION <br />DATE <br />BY <br />DRAWN BY <br />TR <br />1 7-87 <br />03/29/ 1 7 <br />KEC <br />BY <br />DATE <br />MR <br />1 7-307 <br />04/ 1 4/ 1 7 <br />KEC <br />KEC <br />1 /7/98 <br />TR <br />1 7-88 <br />OG/ 1 3/ 1 7 <br />KEC <br />5CALE: 1 "=300' <br />TR 1 8-69 <br />03/07/ ► 8 <br />KEC <br />TR 1 9-93 <br />02128119 <br />MLK <br />MR <br />1 9-3 <br />13 <br />04/ 1 8/ 1 9 <br />MLK <br />TOWNSHIP <br />TR 2 1 -9G <br />03/06/2 1 <br />MLK <br />T 5 N <br />RANGE <br />R8GW <br />I, NICHOLA5 VINCENT AKOMANDO, A KEG15TEKED PROFESSIONAL <br />ENGINEER IN THE STATE OF COLORADO DO HEREBY CERTIFY THAT <br />TH15 MAP 15COKKECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. <br />NICHOLA5 VINCENT AROMANDO <br />P.E. NO. 48238 <br />DATE <br />area of 1 ntere5t <br />5HEET I <br />Au"'611 UAk Twentymile Coal LLC <br />29515 Routt Co. Rd. # 27 <br />Oak Creek, CO 81639 <br />FOIDEL CREEK MINE <br />MAP 24 <br />SURFACE FACILITIES <br />Seam: Surface Country: USA <br />Date: 10/08/14 <br />Drawn By: KEC State: Colorado <br />SCALE: 1"= 300' 0MEN <br />300 ��� <br />Printed By: 185173 <br />Date : Mar 1 1, 2021 <br />Time: I 1 : 1 7 AM <br />I:\Environmental\REVI5I0N\TECH-RV\TR2 1-9G\ACAD\MAP 24 TR2 1-9&clwg <br />