Laserfiche WebLink
Table 4 <br /> Deep Cut, LLC <br /> 22 West Pit <br /> Lagged Depletions from SWSP Period Operations <br /> (all values in acre-feet) <br /> 22 West Pit <br /> Month From Operations From Operations Total <br /> During SWSP Period Prior to August 2018 <br /> [1] [2] [3] <br /> Aug 2021 3.98 0.12 4.10 <br /> Sep 2021 4.26 0.11 4.37 <br /> Oct 2021 4.35 0.10 4.45 <br /> Nov 2021 4.23 0.09 4.32 <br /> Dec 2021 3.97 0.08 4.05 <br /> Jan 2022 3.68 0.06 3.75 <br /> Feb 2022 3.46 0.04 3.50 <br /> Mar 2022 3.32 0.02 3.34 <br /> Apr 2022 3.31 0.00 3.31 <br /> May 2022 3.50 0.00 3.50 <br /> Jun 2022 3.83 0.00 3.83 <br /> Ju12022 4.25 0.00 4.25 <br /> Total 46.13 0.64 46.76 <br /> Note: [1] Projected lagged depletions resulting from operations during the SWSP period. <br /> [2] Lagged depletions during the SWSP period resulting from operations prior to August <br /> 2018. See Table 2 column [2]. <br /> [3] Total lagged depletion equal to [1] + [2]. <br /> BBA <br /> war° Cr MsLlkmyt, BISIIOP-BROGDEN ASSOCIATES, /NC. 6/1/2021 2:39PM PIP, <br />