My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-02_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2021-08-02_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 8:16:28 AM
Creation date
8/3/2021 11:14:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
8/2/2021
Doc Name
Inspection Report
From
DRMS
To
Mountain Coal Company, LLC
Inspection Date
7/30/2021
Email Name
LDS
JDM
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 30, 2021 C-1980-007/West Elk Mine LDS <br />Cessation Order CO-2020-001 was modified on September 17, 2020 as follows: Mountain Coal <br />Company (MCC) is permitted access and use of the existing, temporary road constructed in the Sunset <br />Roadless area for longwall panel SS2 prior to the vacatur of the North Fork Exception, and authorized <br />under PR-15. MCC is permitted to access the two drill pads that were constructed in the Sunset Roadless <br />area for longwall panel SS2 prior to the vacatur of the North Fork Exception. MCC is permitted to <br />construct two additional drill pads in the Sunset Roadless area for longwall panel SS2. MCC is permitted <br />to drill mine ventilation boreholes on the drill pads constructed in the Sunset Roadless area for longwall <br />panel SS2. <br />MCC is not permitted to construct any additional roads in the Sunset Roadless area for longwall <br />panel SS2. <br />MCC is not permitted to conduct any ground disturbing activities in the Sunset Roadless area for <br />longwall panels 3 or 4, or any area not discussed above. <br />Abatement #: 2 <br />Abatement Due Date: 12/11/2020 <br />Abatement Due Extended Date: <br />Abatement Date: <br />Abatement Description: Notwithstanding BLM leases C-1362 and COC-67232, Mountain Coal <br />must provide the Division with detailed information regarding its assertion that it maintains legal right of <br />entry to the Sunset Roadless area and why it is not in direct conflict with the District Court order vacating <br />the North Fork Exception to the Colorado Roadless Rule. This abatement step is specific to longwall <br />panels SS3 and SS4 in the Sunset Roadless area. <br />On October 29, 2020, the 10t" Circuit Court of Appeals issued an Order stating: "Pending our <br />consideration of the appeal, we enjoin Appellee Mountain Coal Company from imminently bulldozing <br />additional drilling pads on [the road constructed after issuance of this court's April 24, 2020, mandate in <br />No. 18-1374] and drilling methane ventilation boreholes in preparation for coal mining in the Sunset <br />Roadless Area." <br />Cessation Order CO-2020-001 remains in place, however the Appeals Court Order controls the Cessation <br />Order <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.