Laserfiche WebLink
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: and completion: <br /> Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br /> permit. An Operator possessing a I I I(1)(b) Reclamation Permit must convert to the appropriate <br /> regular construction materials permit if extraction and export of materials from the site are not <br /> completed within 12 months after the issuance of the permit. <br /> 2) Depth of topsoil to be salvaged (check one): <br /> 4-6 inches __LL6-8 inches <br /> 8-10 inches _F-1 10-12 inches <br /> F-1_Other: <br /> R N/A, explain: <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> 4) Thickness of overburden needed to be moved: 3 feet or N/A <br /> 5) Thickness of deposit to be mined: feet <br /> 6) How will the mine be accessed: ( existing roads new roads will be created <br /> a. Please describe the existing roads: <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements (note, new roads must be included in permitted acreage): <br /> 7) Will water be needed during the mining operation (check one): Yes or (L]) No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> o elation: <br />