Laserfiche WebLink
-2- <br /> 9. Primary Mine Entrance Location(report in either Latitude/Longitude OR UTM): <br /> Latitude/Longitude: <br /> Example: (N) 390 44' 12.98" <br /> (W) 104° 59' 3.87" <br /> Latitude(N): deg _ min sec (2 decimal places) <br /> Longitude(W): deg min�°� sec�.� (2 decimal places) <br /> OR <br /> Example: (N) 39.736910 <br /> (W) -104.984490 <br /> Latitude(N) (5 decimal places) <br /> Longitude(W) (5 decimal places) <br /> OR <br /> Universal Transverse Mercator(UTM) <br /> Example: 201336.3 E NAD27 Zone 13 <br /> 4398351.2 N <br /> UTM Datum(specify NAD27,NAD83 or WGS 84) Zone <br /> Easting <br /> Northing <br /> 11. Primary Present Land Use check only one): <br /> Cropland(CR) ❑Pastureland(PL) El General Agriculture(GA) <br /> ❑Rangeland(RL) ❑Forestry(FR) ❑Wildlife Habitat(WL) <br /> ❑Residential(RS) ❑Recreation(RC) ❑Industrial/Commercial(IC) <br /> ❑Developed Water Resources(WR) <br /> 10. Primary Future(Post-mining) Land Use check on! ne : <br /> ❑Cropland(CR) II Pastureland(PL) 1 4 1 General Agriculture(GA) <br /> ❑Rangeland(RL) ❑Forestry(FR) ❑Wildlife Habitat(WL) <br /> ❑Residential(RS) 1J Recreation(RC) ❑Industrial/Commercial(IC) <br /> ❑Developed Water Resources(WR) <br /> 12. Duration of Proiect: <br /> 12.1 Estimated beginning date of excavation: AQ.AA 1 . 2,0 2,1 <br /> 12.2 Estimated completion date of excavation: mr,�LN^,�Z 7 3, <br />