Laserfiche WebLink
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: Hm 1 1 2,021 and completion: <br /> Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br /> permit. An Operator possessing a 111(1)(b) Reclamation Permit must convert to the appropriate <br /> regular constriction materials permit if extraction and export of materials from the site are not <br /> completed within 12 months after the issuance of the pen-nit. <br /> 2)�Depth of topsoil to be salvaged (check one): <br /> _4-6 inches __E]_6-8 inches <br /> 8-10 inches __E _10-12 inches <br /> F-1—Other: <br /> F-1—N/A, explain: <br /> 3) Description of how topsoil will be stockpiled and stabilized: <br /> 4) Thickness of overburden needed to be moved: 3 feet or N/A <br /> 5) Thickness of deposit to be mined: feet <br /> 6) How will the mine be accessed:la existing roads (El) new roads will be created <br /> a. Please describe the existing roads: <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements (note, new roads must be included in pennitted acreage): <br /> 7) Will water be needed during the mining operation (check one): (�El Yes or dLI) No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> o VA <br /> tion: , <br />