My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-29_INSPECTION - M2001022
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001022
>
2021-07-29_INSPECTION - M2001022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 5:51:27 AM
Creation date
8/2/2021 5:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001022
IBM Index Class Name
Inspection
Doc Date
7/29/2021
Doc Name
Corrective Action Documentation
From
Loveland Ready-Mix
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/14/2021 State.co.us Executive Branch Mail-Explanation of Slope on Map on our request for reconsidering your decisions <br /> ' STATE OF <br /> Ebert-DNR, Jared<jared.ebert@state.co.us> <br /> x COLORADO <br /> Explanation of Slope on Map on our request for reconsidering your decisions <br /> JAMIE MCGILL<jam2finance@yahoo.com> Mon, Jun 14, 2021 at 8:41 AM <br /> ' To: Jared Ebert- DNR <jared.ebert@state.co.us>, Peter Hays- DNR <peter.hays@state.co.us>, Dc_construction <br /> <dc_construction@ymail.com> <br /> ' Good Morning, <br /> Here is a letter on how the slope information was obtained as you requested we are submitting this <br /> information as appealing your decision under rule 1.4.11. This reclamation is a Wildlife and pasture land <br /> ' under performance standards 3.1.1 and also the decription that LRM used on its reclamation application that <br /> has already been provided to DRMS. We are asking you to reconsider your decision in regards to passing LRM on the <br /> current slope of the lake. We are providing you the information proving that LRM does not meet the states <br /> minimum guidelines stated in rule 3.1.5. #7 where it states"Maximum slopes and slope combinations shall be <br /> 1 compatible with the configuration of surrounding conditions and selected land use. In all cases where a <br /> lake or pond is produced as a portion of the reclamation plan, all slopes, unless otherwise approved by the <br /> Board or Office, shall be no steeper that a ratio of 2:1 (horizontal to vertical ratio). except from 5 feet above to <br /> ' 10 feet below the expected water line where slopes shall be not steeper than 3:1. If a swimming area is proposed <br /> as a portion of the Reclamation Plan, the slope, unless otherwise approved by the Board or Office, shall be <br /> no steeper than 5:1 throughout the area proposed for swimming, and a slope no steeper than 2:1 elsewhere in <br /> the pond." page 43 of mining rules and regulations. <br /> ' The other violations not addressed we provided pictures and in person with both of you should the <br /> several sink holes and actual 5 foot divot on the river from where LRM pumped water from the river to the lake to <br /> fill it in 2018. 1 have given you maps and pictures to show you that these areas where changed from <br /> t excavations, trenches an other disturbances and you ignore the evidence again. Under Surface Reclamation <br /> Page 85 of the rules it states 5.5.2 Specific Requirements (d)"mud pits, excavations, trenches, or <br /> other disturbance shall be backfilled and graded to blend with the surrounding land surface." This has not <br /> been enforced and is being ignored as well and I just do not understand why. <br /> ' I have submitted copies of their reclamation plan where LRM stated they would control weeds and mow and keep a neat <br /> appearance, that has not been enforced either. Can you please explain why they do not have to mow? <br /> ' It has now been confirmed by Jared that no inspection was done in 2017 prior to fill the lake. I filled a <br /> complaint in 2018 in regards to the slope and in fact still no survey was required or inspection completed until <br /> June 26th of 2019. 1 understand the only survey that LRM submitted was 1/2/2019, if I am wrong please <br /> provide me their current survey. They had til July 24th to make the corrections requested on June 24th <br /> inspection. LRM submitted a letter written by Stephanie Francher English stating that they complied and fixed the <br /> eroding slope dated July 17, 2019 and they inspected the slope and had a engineer confirm off of a drawing. We <br /> provided you pictures time stamped and date July 23, 2019 and they were not even half way through with the fix <br /> ' and this was acceptable as well. <br /> We are asking you evaluate all the evidence that we have provided and reconsidered your decisions and include <br /> all violations that are not be performed or completed by LRM according to the Mineral Rules and Regulations of the <br /> ' Colorado Mined Land Reclamation Board for the Extraction of Construction materials dated and effective <br /> July 15,2019. There are 29 zones in our exhibit so I will have to send several emails to make sure you get <br /> every picture, my computer will not send a file that is that large. Sorry for any inconvenience. <br /> ' Sincerely <br /> Jamie and Dustin Christensen <br /> 785-230-8400 <br /> ' 970-420-5137 <br /> jam2finance@yahoo.com <br /> ' 5 attachments <br /> — scan.pdf <br /> ' 393K <br /> https://mail.google.com/mail/u/0?ik=86aa78d9e6&view=pt&search=all&permmsgid=msg-f%3Al 7O2553656182572250&simpl=msg-f%3Al 7O25536561... 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.