Laserfiche WebLink
Completion of the reclamation plan described herein shall meet the requirements <br /> of Section 3.1 <br /> (d) Topsoil Segregation <br /> Topsoil shall be segregated as shown in Exhibit C-2. <br /> (e) Reclamation Sequence and Timetable <br /> An estimate of the sequence and periods of time for each reclamation activity is <br /> given in Table 6.4.5-1. <br /> Table 6.4.5-1. Reclamation Sequence Summary <br /> Mining Cell / Size Reclamation Activity Approximate Time Period <br /> Cell 2 / 35 acres Construct Compacted Clay Following Mining of Cell 2 <br /> Liner and Construct <br /> Appurtenant Pipeworks <br /> Cell 2 / 35 acres Perform Topsoiling / Following Construction of <br /> Revegetation Compacted Clay Liner <br /> Cell 4 / 26 acres Construct Compacted Clay Following Mining of Cell 4 <br /> Liner and Construct <br /> Appurtenant Pipeworks <br /> Cell 4 / 26 acres Perform Topsoiling / Following Construction of <br /> Revegetation Compacted Clay Liner <br /> Cell 2A Perform Topsoiling / Following Construction of <br /> Revegetation Embankment dam and Clay <br /> Liner <br /> (f) Descriptions and Specification of Reclamation activities <br /> (i) Final Grading <br /> Final slopes will be graded to 3H:1 V <br /> (ii-v) Seeding, Fertilization, Revegetation, Topsoiling <br /> Topsoil Replacement/ Revegetation <br /> Topsoil will be replaced to an approximate depth of 1 ft for the areas shown in as <br /> topsoil/revegetation areas in Exhibit F Sheets 1-2. The overburden stockpile to <br /> the west of Cell 2 will continue to supply fill material after the reservoirs are <br /> reclaimed, therefore only revegetation will occur in that area. Once the fill has <br /> been removed from the site, the underlying topsoil will be reseeded again. <br /> Seeding and Fertilizing <br /> The proposed seeding areas are shown on Exhibit F — Reclamation Plan Map. <br /> The recommended seeding method is by drill and seeding rates assume this <br /> method. The species composition of the seed mixture recommended for <br /> reclamation is shown in Table E-3 below. <br />