Laserfiche WebLink
6.4.5 Exhibit E - Reclamation Plan <br /> (a) Description of the Type of Reclamation <br /> The site will be reclaimed to developed water resource and will construct three <br /> additional water storage reservoirs Reservoir#2, Reservoir #4, and Reservoir <br /> #2A which correspond to Cells 2, 4 and 2A respectively. Reservoir#2 shall have <br /> a normal pool water surface area of approximately 32 acres. Reservoir #4 will <br /> have a normal pool water surface area of approximately 24 acres. Reservoir 2A <br /> will have a normal pool water surface area of 38.3 acres. Both reservoirs #2 and <br /> #4 will be constructed with a compacted clay liner around the perimeter of the <br /> mining highwall as shown in Figure 6.4.5 — 1 Typical Section, and Exhibit F, <br /> Sheets 1-4. Reservoir 2A will be constructed with an embankment dam along the <br /> north east and west sides as shown in Sheet 6. Detailed engineering plans for <br /> the embankment dam have been submitted to the Office of the State Engineer <br /> along with the application form. These documents are given in Attachment A. <br /> The south portion of the perimeter of Cell 2A which is not part of the <br /> embankment dam will be reclaimed by constructing a compacted clay liner to the <br /> same specifications as Cells 2, and 4. <br /> Reclamation Earthwork/Compacted Clay Liner Construction <br /> A summary table of reclamation earthwork volumes, areas and lengths is given <br /> as Table 6.4.5-1. <br /> Table 6.4.5-1. Reclamation Earthwork Summary <br /> CELL 2 30-45ft deep <br /> ITEM VOLUMES LENGTH AREAS <br /> Total Embankment 163,040.00 yd3 <br /> Clay Liner 90,507.25 yd3 <br /> Slope fill 76,550.00 yd3 <br /> Keyway Volume 4017.25 yd3 <br /> Keyway Length 4338.63 ft <br /> Pit Floor Area 150,390.76 yd2 <br /> Pit Floor Area 31.13 ac <br />