Laserfiche WebLink
Material Keys <br /> Existing waste rock <br /> 250 — I mill lawngs <br /> BO&OCk <br /> 200 — <br /> 150 — <br /> 100 — <br /> 50 <br /> 0 — — — — — — — <br /> -50 <br /> Analysis 3 <br /> Multiple Stability Analysis <br /> -100 — Method, Bishop Simplified <br /> Surface. Circular (Critical Seed) <br /> Remits <br /> -150 0 50 100 150 200 250 300 350 400 450 500 550 Critical Fodor of Safety: 3.31 <br /> GALENA Yvionato Licensed to: Greg Lewicki and Associates <br /> HOW: 13 Nov 2015 <br /> Project Ouray Silver Mine - Atlas Waste Pile Processet 13 Nov 2016 <br /> Lab Scenario 2 pt3 <br /> File. DADropbWRevenue Mine�mOhmill cedihcaliWSIope Stablity'Allas F410 Lab Scenario 2.gmf <br />