Laserfiche WebLink
Ouray Silver Mines, Inc. <br /> 1900 Main St. Unit 1 <br /> PO Box 564 <br /> Ouray,CO 81427 <br /> IIcJRAV -S1LLER A41,%'E <br /> To: Colorado Division of Reclamation, Mining, & Safety <br /> 1313 Sherman St. Rm. 215 REC�!IVED <br /> Denver, CO 80203 1� <br /> July 16, 2021 <br /> JUL 21 2021 <br /> DIVISION OF RECLAMATION <br /> Dear Mr. West MINING&SAFETY <br /> Ouray Silver Mines Inc. (OSMI) received the 2nd Adequacy Review for Technical Revision 15 to Permit <br /> M2012-032 for the Revenue-Virginius Mine(Mine). The Adequacy Review raised 8 major points, each <br /> of which are addressed in italics under headings that repeat the DRMS point of clarification. A list of <br /> tables and attachments added to this Adequacy Review Response is found below: <br /> CTL Thompson Report <br /> Tailings and Waste Rock Management Plan <br /> Updated Table 9 <br /> Map 1. Surface Map with Temporary Lined Tailings Storage <br /> 1. The response submitted in TR-15 does not match design specifications previously submitted <br /> to and approved by the Division. The Tailings Storage Facilities as prepared by SRK <br /> Consulting in 2016 appear to be in conflict with the Permit File, please submit the currently <br /> approved Tailings Storage Facility designs. <br /> Re.V)onse: Please see the attached TSF designs. The Tailings crud Waste Rock Managemenl Plan <br /> and the complete 2015 C'TL Thompson Report cure attached,for the Divisions reference. A <br /> geotechnical sl ucly of tailings will be completed by Knight Piesold once the mill has been <br /> coznunissioned and is prodzucing tailings. The results of the study will be shared with the division <br /> once completed. <br /> 2. During the onsite inspection conducted by the Division on July 8, 2021 it was explained that <br /> the Slurry Storage Tanks would be located in the crusher gallery at the bottom of the ore <br /> conveyor that will deliver ore material to the Rod Mill and the Mill Tunnel, however the <br /> drawings depict the Slurry Storage Tanks adjacent to the Mill Tunnel at the top of the <br /> conveyor. Please clarify if the drawings are accurate and that is the proposed location of the <br /> tanks. <br /> Response: The slurry storage tanks will be located adjacent to the AN/ Tunnel as depicted in the <br /> drenrings. <br /> 3. Your response to Item 20 of Adequacy Review l is noted, however please commit to <br /> providing the Division with a representative SDS of the Zinc concentrate and Lead <br /> concentrate within 30 days of production of the first shipment as a baseline <br /> Phone: (970)325-9830 ♦ Fax: (970)325-9824 <br />