Laserfiche WebLink
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2—VIMA Partners, LLC <br /> Exhibit C — Pre-Mining Plan Map(s) of Affected Lands <br /> (a) all adjoining surface owners of record; <br /> See attached map in Exhibit C. <br /> (b) the name and location of all creeks, roads, buildings, oil and gas wells and lines, and <br /> power and communication lines on the area of affected land and within two hundred <br /> (200) feet of all boundaries of such area; <br /> See attached map in Exhibit C. <br /> (c) the existing topography of the area with contour lines of sufficient detail to portray the <br /> direction and rate of slope of the affected land; <br /> See attached map in Exhibit C. <br /> (d) the total area to be involved in the operation, including the area to be mined and the <br /> area of affected lands (see definition of"Affected Land"); <br /> The total affected land area is 110 acres. <br /> (e) the type of present vegetation covering the affected lands; and <br /> The majority of vegetation has been stripped under the construction of the <br /> existing detention pond and under the ongoing construction under the State <br /> issued 111 Permit No. M-2021-020. The areas that have not been stripped consist <br /> of native grasses. <br /> (f) in conjunction with Exhibit G - Water Information, Rule 6.4.7, if required by the Office, <br /> further water resources information will be presented on a map in this section. <br /> 1) N/A <br /> 2a) See attached map in Exhibit C <br /> 2b) None <br /> 2c) During operation stormwater will be discharged utilizing procedures and <br /> practices as defined in the Mile High Flood District Criteria Manual for dewatering <br /> at the existing detention pond outlet structure. After operation stormwater will <br /> enter at two points along the north side and will be pumped out within 36 hours at <br /> a volume equal to the inflow volume. <br /> 3) During operation very little water is anticipated to be used. Water will be applied <br /> for dust control by a water truck as needed and is estimated at less than 3,000 <br /> gallons per day. After operation the site will be operated as a reservoir. The <br /> capacity is designed at 1,500 acre feet with approximately 475 acre feet of annual <br /> consumption divided between Raindance River Reservoir and Reservoir Number 2. <br /> Water use from each reservoir will vary from year to year based on water availability <br /> and operation. <br /> 4) During operation, construction water will be purchased from the Town of Windsor <br /> via a fire hydrant meter. After operation raw water will be pumped from Raindance <br /> River Reservoir and the BH Eaton ditch diversion from the Poudre River. Storage <br /> TST.ING.CONSULTING ENGINEERS <br />