Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) Fl Pastureland(PL) General Agriculture(GA) <br /> F1 Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> C1Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) LJ Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Strip topsoil and overburden. Drill and blast the obsidian, move with loader, stockpile for processing. <br /> 15. On Site Processing: —Z Crushing/Screening <br /> 1 I n fl ex .n mining ethod(e. truck/shovel): <br /> ove bro�Ce�i eoRiAian to crshmer, stock le the product uritil exported. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Operator is expanding existing obsidian quarry operation, which requires additional permitted <br /> acreage for expansion of the existing quarry operations, in southern half of the new 112c <br /> expanded (112c) permit area. <br />