My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-16_PERMIT FILE - M2021048
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021048
>
2021-07-16_PERMIT FILE - M2021048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 12:16:41 PM
Creation date
7/19/2021 6:01:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021048
IBM Index Class Name
PERMIT FILE
Doc Date
7/16/2021
Doc Name
Application
From
Zak Dirt, Inc.
To
DRMS
Email Name
ERR
JDM
JXT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8718B3AF-El B8-4D4D-9A69-EDC9EA6A5FE5 <br /> PO#:461001607 <br /> Routing#:2 1-HA2-ZG-00095 <br /> STATE OF COLORADO CONTRACT <br /> COVER PAGE <br /> State Agency Agreement Number <br /> Colorado Department of Transportation and Bridge 21-HA2-ZG-00095 <br /> Enterprise <br /> Contractor Contract Performance Beginning Date <br /> ZAK DIRT INC Shall be the Effective Date of the approval of the <br /> State Controller or designee. <br /> Contract Maximum Amount Initial Contract Expiration Date <br /> Shall be five years from the Effective Date or the <br /> $2,767,543.82 date of final acceptance of the project whichever <br /> occurs first. <br /> Contract Purpose <br /> Furnish all Materials and perform all services not specifically excepted in this Contract that are necessary or <br /> incidental to the complete construction of Colorado Project No.FBR 2854-143(22865)consisting of <br /> highway and bridge construction or maintenance consisting of rebuilding the approaches to the bridge and <br /> replacing the guardrail,located on US 285 MM 172.36 in Park County in the State of Colorado as <br /> described in the Plans and Specifications for the project incorporated herein by reference. <br /> Exhibits and Order of Precedence <br /> The following Exhibits and attachments are included with this Contract: <br /> 1. Exhibit A—Contractor Bid Proposal <br /> 2. Exhibit B—Performance Bond <br /> 3. Exhibit C—Payment Bond <br /> 4. Exhibit D—Federal Requirements <br /> 5. Exhibit E—Notification of Commitments Within 10%of Original Bid <br /> 6. Exhibit F—Sample Funding Letter <br /> 7. Exhibit G—Contract Modification Order <br /> 8. Exhibit H—Required Contract Provisions Federal-Aid Construction Contracts <br /> In the event of a conflict or inconsistency between this Contract and any Exhibit or attachment,such <br /> conflict or inconsistency shall be resolved by reference to the documents in the following order of priority: <br /> 1. Exhibit D—Federal Requirements <br /> 2. Colorado Special Provisions in§20 of the main body of this Contract. <br /> 3. Special Provisions for the Project <br /> a. Project Special Provisions <br /> b. Standard Special Provisions <br /> 4. Project Plans <br /> 5. Project Specifications <br /> 6. The provisions of the other sections of the main body of this Contract. <br /> 7. Exhibit A—Contractor's Bid Proposal. <br /> 8. Exhibits B through G in descending order <br /> Principal Representatives <br /> For the State: For Contractor: <br /> Daniel Hunt Jeromy Weiss <br /> Colorado Department of Transportation(112) ZAK DIRT INC <br /> 1480 Quail Lake Loop,Ste A 14290 HILLTOP RD <br /> Colorado Springs,CO 80906 LONGMONT,CO 80504 <br /> 719-227-3231 970-535-4657 <br /> daniel.hunt@state.co.us jweiss@zakdirt.com <br /> Document Builder Generated Page 1 of 52 Version 0419 <br />
The URL can be used to link to this page
Your browser does not support the video tag.