Laserfiche WebLink
� �.shiF�� .r '••,Il, <br /> 7 <br /> AV <br /> Photo 3-Mill Tunnel looking south toward filtrate tanks and flotation cells.Floor is graded 1%to the south and away from the portal. <br /> Decline to crushing gallery entrance is visible on right. <br /> `{ <br /> t <br /> psi i <br /> Photo d-Reagent room of the filter building,where the chemicals are stored.The large yellow tanks in the background are the 18,000 <br /> gollon tailings slurry and process water tanks. <br /> Revenue Mill Certification Page 7 of 20 <br />