_i4� <br /> &DRAY SILVER MINES <br /> 16. Please clarify the number of tanks associated with the Zn Rougher Scavenger Flotation Cells <br /> and their capacity. <br /> Response:2 banks of 3 cells as shown on the MID drawings. Each bank is 1320 gallons. These are pre- <br /> existing tanks that were part of the original mill certification from 2015. Please see Figure 2. <br /> 17. It is also stated that the Zn Rougher Flotation Cells consists of two banks at 1320 gallons each, <br /> however Table 1 lists only one tank at 1320 gallons. Please clarify the number of tanks associated <br /> with this stage of the circuit and update Table 1. <br /> Response: There is one Zinc Rougher Flotation Tank Cell at 1700 gallons, as shown on drawing 300-PI- <br /> 007.As with lead there are two Zinc scavenger rougher flotation cells at 1320 gallons each. <br /> 18. Several depictions of tanks and circuitry on Figure 1 are not labeled. Please update Figure 1 <br /> to include all labels. <br /> Response: This is a simplified flow diagram designed for presentation to the general public. It is a <br /> simplified version of the milling process for those inexperienced in the flow process. It is not intended to <br /> replace the P&IDs. For further clarification see the MID drawing. <br /> 19. Provide a summary of the day tanks that are to be located in the mill tunnel. <br /> a. Include the location, chemical type, volume, quantity (where applicable) and <br /> referenced drawing(s) <br /> b. Section 4 discusses the new reagent tanks, pump boxes and pumps to be added <br /> to support the new Pb and Zn flotation circuits and references Table 2 for their volume <br /> and secondary containment.Table 2 appears to be consistent with the tables submitted <br /> for reagent storage in the Reagent Building that is currently under review as part of <br /> TR-14. Please clarify if this section is applicable to the Reagent Building or if additional <br /> mixing and storage tanks will be located in the mill tunnel in addition to the day tanks. <br /> c. Section 6 - Chemical Handling Systems and Containment states that "Reagents are <br /> stored in the reagent room located on the east side of the mill filter building except the <br /> lime day tank of 9200 gallons." Conversely the updated Table 1 on page 24 of the <br /> Second Adequacy Review submitted for TR-14 states that day tanks for ALL chemicals <br /> EXCEPT lime and Floc AF-309 have 70 gallon day tanks located in the mill tunnel. Please <br /> clarify what chemicals have a day tank associated with them, if that tank houses <br /> concentrated chemicals or mixed solution, the locations of the day tanks and update <br /> Table 1 of TR-15 to reflect the storage of those materials within the mill tunnel. <br /> Response: <br /> a. Please see the attached Table 8 which provides a summary of the day tanks located in the mill <br /> tunnel. <br /> b. Table 2 is consistent with tables submitted for reagent storage in the Reagent Building. No <br /> additional mixing and storage tanks will be located in the mill tunnel in addition to the day tanks. <br /> c. The statement regarding the lime day tank in TR-15 is not accurate. The lime storage tank off <br /> 9200 gallons is in the reagent room which is part of the mill filter building. There is no lime day <br /> tank. The language in TR-14 is correct. <br /> 5 1 P a g e <br />