My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-14_REVISION - M2012032 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-07-14_REVISION - M2012032 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 7:41:18 AM
Creation date
7/15/2021 6:26:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
7/14/2021
Doc Name Note
I of II
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Type & Sequence
TR15
Email Name
LJW
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_i4� <br /> &DRAY SILVER MINES <br /> 16. Please clarify the number of tanks associated with the Zn Rougher Scavenger Flotation Cells <br /> and their capacity. <br /> Response:2 banks of 3 cells as shown on the MID drawings. Each bank is 1320 gallons. These are pre- <br /> existing tanks that were part of the original mill certification from 2015. Please see Figure 2. <br /> 17. It is also stated that the Zn Rougher Flotation Cells consists of two banks at 1320 gallons each, <br /> however Table 1 lists only one tank at 1320 gallons. Please clarify the number of tanks associated <br /> with this stage of the circuit and update Table 1. <br /> Response: There is one Zinc Rougher Flotation Tank Cell at 1700 gallons, as shown on drawing 300-PI- <br /> 007.As with lead there are two Zinc scavenger rougher flotation cells at 1320 gallons each. <br /> 18. Several depictions of tanks and circuitry on Figure 1 are not labeled. Please update Figure 1 <br /> to include all labels. <br /> Response: This is a simplified flow diagram designed for presentation to the general public. It is a <br /> simplified version of the milling process for those inexperienced in the flow process. It is not intended to <br /> replace the P&IDs. For further clarification see the MID drawing. <br /> 19. Provide a summary of the day tanks that are to be located in the mill tunnel. <br /> a. Include the location, chemical type, volume, quantity (where applicable) and <br /> referenced drawing(s) <br /> b. Section 4 discusses the new reagent tanks, pump boxes and pumps to be added <br /> to support the new Pb and Zn flotation circuits and references Table 2 for their volume <br /> and secondary containment.Table 2 appears to be consistent with the tables submitted <br /> for reagent storage in the Reagent Building that is currently under review as part of <br /> TR-14. Please clarify if this section is applicable to the Reagent Building or if additional <br /> mixing and storage tanks will be located in the mill tunnel in addition to the day tanks. <br /> c. Section 6 - Chemical Handling Systems and Containment states that "Reagents are <br /> stored in the reagent room located on the east side of the mill filter building except the <br /> lime day tank of 9200 gallons." Conversely the updated Table 1 on page 24 of the <br /> Second Adequacy Review submitted for TR-14 states that day tanks for ALL chemicals <br /> EXCEPT lime and Floc AF-309 have 70 gallon day tanks located in the mill tunnel. Please <br /> clarify what chemicals have a day tank associated with them, if that tank houses <br /> concentrated chemicals or mixed solution, the locations of the day tanks and update <br /> Table 1 of TR-15 to reflect the storage of those materials within the mill tunnel. <br /> Response: <br /> a. Please see the attached Table 8 which provides a summary of the day tanks located in the mill <br /> tunnel. <br /> b. Table 2 is consistent with tables submitted for reagent storage in the Reagent Building. No <br /> additional mixing and storage tanks will be located in the mill tunnel in addition to the day tanks. <br /> c. The statement regarding the lime day tank in TR-15 is not accurate. The lime storage tank off <br /> 9200 gallons is in the reagent room which is part of the mill filter building. There is no lime day <br /> tank. The language in TR-14 is correct. <br /> 5 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.