My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-14_REVISION - M2012032 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-07-14_REVISION - M2012032 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 7:41:18 AM
Creation date
7/15/2021 6:26:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
7/14/2021
Doc Name Note
I of II
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Type & Sequence
TR15
Email Name
LJW
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br /> I. DUtt/STANDBY <br /> PROCESS WATER <br /> z'-Pw-cs-az4 <br /> 001 <br /> Bv01 <br /> RY m <br /> aea an <br /> gg -------- - --- ------------ --------- <br /> t-tH'-ev, ,-Va•-Bvo, III <br /> I <br /> ROD MILL DISCHARGE ai <br /> PUMP BOX <br /> 001 2--A-WRI I-o53 Q <br /> 2'-KG02 �2'-KGD2 <br /> I <br /> E I <br /> - I <br /> I <br /> GO I OMO � <br /> 0/F 0 F <br /> � I <br /> I•-B�o1 I <br /> eee111 I <br /> 0•-KG02� J I <br /> Q <br /> R 10'-a-CS <br /> 1p <br /> SLURRY STORAGE TANK 1t <br /> TRANSFER PUMP N2(N) I ,0._A-G5 SLURRY STORAGE TANK j <br /> (300-PPC-33B) TRANSFER PUMP�1 (N) <br /> R (NOTE 1) 3--KC01 a--KCO2 a--KG02 S--NCOi <br /> pR.W pWN (300-PPC-33A) WET SCREEN <br /> 8 M T T M FEED PUMP BOX <br /> 2 _ _ T_ Y-R-50R)-o55 2--a-5oRtt-o5T 300-%-003 <br /> 2'-Boot z--ew, WEST SLURRY EAST SLURRY Y-moo, 2--trot <br /> ` R STORAGE TANK(N) STORAGE TANK(N) °1 <br /> $� 8 (300-TKO-30B) (300-TKO-30A) <br /> 4 WEST SLURRY STORAGE EAST SLURRY STORAGE <br /> TANK AGITATOR(N) TANK AGRATOR(N) <br /> 3 a (300-AGA-30B) (300-AGA-30A) <br /> R 1R^I=71{ <br /> I <br /> R <br /> � 2--a-soar t-ose <br /> BALL MILL AREA <br /> FLOOR <br /> I IGIND <br /> i 8 —N - NEW EQUIPMENT •tie <br /> a —R-MODIFIED/REFURBISHED EQUIPMENT <br /> C _ E-EXISTING EQUIPMENT <br /> C-0. <br /> ----INTERMITTENT/BYPASS n w' <br /> 3 —_--FUTURE <br /> AS SHOWN S Burk PROJECT No. <br /> - -- PROCESS PLANT UPGRADES <br /> aRm <br /> mrlssmucTax - /at N N a/m ti WR ENGINEEMW CO. 9/10/20 06 46-1001.04 <br /> g a wo <br /> R[M27E OBSOLETE-STORAGE TANKS.� D BACK TO DESIGN - _ - -BARR su- sounl uuN slRccr '� sLu/Ruc OURAY SILVER MINES, INC. REVENUE VIRGINIUS MINE su1 E RE-ISSUED FOR GDNSTRKPON - SALT—E cnY,a anal °i TFG2 CURRY. COLORADO 276 TPD CONCENTRATOR-ROD MIWNG No. REV No <br /> O FOR CONSTRUCTION RT LVSED A B C 0 1 2 3 w - -et- n o.ah^•e REVISION DESCRIPTION D/DR DATE RElFASED - »i)...0 mI PROCESS CONTROL DIAGRAM <br /> 300-PI-002 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.