Laserfiche WebLink
Scraper Worksheet Cont'd Task#090 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 6200 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (°/u) (min) <br /> 1 800.00 -12.50 5.00 -7.50 1628 0.61 <br /> Haul Time: 0.61 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (°/u) (min) <br /> 1 800.00 12.50 5.00 17.50 832 0.98 <br /> Return Time: 0.98 minutes <br /> Total Scraper team cycle time: 3.19 minutes <br /> Adjusted for job conditions: 905.45 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 905.45 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 905.45 LCY/Hour <br /> Unadjusted unit production/hour: 1,090.91 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 1.86 Hours <br /> Unit cost: $0.990 /LCY Total job cost: $1,670 <br /> CIRCES Cost Estimating Software <br />